Dialogues des Carmélites 2020: Difference between revisions
SMacluskie (talk | contribs) |
|||
(33 intermediate revisions by 8 users not shown) | |||
Line 1: | Line 1: | ||
[[Category:Productions]] | [[Category:Productions]] | ||
[[Category:Virtual]] | |||
[[Category:Opera]] | [[Category:Opera]] | ||
[[Category:New Athenaeum]] | [[Category:New Athenaeum]] | ||
Line 72: | Line 73: | ||
<pdf>Opera.pdf</pdf> | <pdf>Opera.pdf</pdf> | ||
''' | '''Sliding Front Cloth''' | ||
There was two front cloths for this show one that would fly up and down and another that would slide with a center stage split. The sliding cloth would have a hard masker as a leading edge so using one track we had to make sure that when it was full open the maskers were off stage. All the components that would be used to make this work were drawn up and added to a vectorworks drawing to give an accurate representation of what would be put up on the stage. | |||
<pdf>Sliding_masking.pdf</pdf> | |||
'''Sliding Back Wall''' | |||
There was a sliding back wall panel that to track Stage Left in the middle of Act 3 as discreetly as possible. The wall would be set up in a dead hang system with our Flyman as the operator. Using a series of pulleys, the lines would be diverted to the Flyfloor for our Flyman to pull down. This would trigger a weight bag that we have put below the ladder on Stage Left to lower and pull the wall panel with it. The panel will be tracked and there will be a guide attached to it at the top. he guide will be a wire rope tensioned across two of the pillars on the back wall with a tirfor winch. The wall will be attached to this guide using a screw eye that will be placed in the top of the wall panel. The Vectorworks drawing that compliments this description has been added for perusal, giving a concise representation of what we would have built onstage. | |||
<pdf>Dialogue_des_Carmelites_Void_Door_Top_.pdf</pdf> | |||
<pdf> | <pdf>Dialogue_des_Carmelites_Void_Door_Right_ISO.pdf</pdf> | ||
<pdf>Dialogue_des_Carmelites_Void_Door_Right_Rear_ISO.pdf</pdf> | |||
'''Equipment''' | '''Equipment''' | ||
Two kit lists were produced for the stage department for this show, One of them was for flys and automation with the other for the stage. Having two lists helped to split up who was needing what equipment and also saved issues if we both tried to makes updates at the same time. The lists have been broken down into section that they should be prepped as and labelled making it easier when fitting up on the stage. | |||
<pdf>Stage_Kit_List.pdf</pdf> | |||
<pdf>Flys_&_Auto_Equipment_List_V3.pdf</pdf> | |||
'''Health And Safety''' | '''Health And Safety''' | ||
<pdf>Opera_2_TSD_RA's_(1).pdf</pdf> | |||
'''Pre Show Checks''' | '''Pre Show Checks''' | ||
With all 4 team members having different tasks during the pre show time everyone had a different list with all moving aspects of the show needing checked fully. Meaning all revolve cues would be run daily before each show to test it as it would be run but also for the operator to get the feel of the control. We also needed to check all flying and automation pieces along with the sliding back wall panel and the various parts to that. | |||
<pdf>Opera_2_preshow_checks.pdf</pdf> | |||
==Lighting | ==Flys & Automation== | ||
'''Head of Flys & Automation''' Darren Wilson | |||
The show has very little flown aspects to it, with the majority of counterweight bars being used for the LX overhead rig. The only flown element during the show is a Full Black downstage. | |||
As part of the LX design it was requested that there be a truss flown above the revolve, due to the size of the required truss it was decided the truss should be flown on 4 Big Tow winches as the truss was too small to drop chain hoist points down the grid wells and we wanted to avoid removing grid panels and bridles. The LX truss had to be dead hung from a mother grid (with the mother grid being flown on the Big Tow winches) as we couldn't get the 2 downstage points of the LX truss with the winches due to the no fly zones. Above the Mother Grid there will be a Counterweight bar that will be attached to the LX truss with a drift and some half couplers with eye bolts, this is for the cable run, 2 extra weights will be put in the cradle and the brake will be let off to allow the bar to run in and out when the LX truss moves on automation. | |||
There is a 16.5m truss span downstage that holds the track for the sliding masking. The truss is rigged on 4 Loadgaurd chain motors and is strapped of the fly floors. | |||
There is also a 5m FOH truss rigged of catwalk 1. | |||
===Flys Bible=== | |||
<pdf>Dialouge_Des_Carmelites_Flys_Bible1.pdf</pdf> | |||
===Automation Plot=== | |||
<pdf>Opera_2_Automation_Plot.pdf</pdf> | |||
===Action Plan=== | |||
<pdf>Flys_&_Auto_Action_Plan.pdf</pdf> | |||
===Points Plan=== | |||
<pdf>Opera_2_Points_Plan.pdf</pdf> | |||
===Points Master=== | |||
<pdf>Opera_2_Points_Master_V4.pdf</pdf> | |||
===Grid Plan=== | |||
<pdf>Grid_Plan_V3.pdf</pdf> | |||
=Stage Management= | |||
'''The team''' | |||
Stage Manager: [[Jessica McKay]] | |||
Deputy Stage Manager: [[Fiona Elliott]] | |||
Senior Assistant Stage Manager: [[Nele Hähnsen]] | |||
Assistant Stage Manager: [[Alexandra McKenna]] | |||
Assistant Stage Manager: [[Coral Nelson]] | |||
Assistant Stage Manager: [[India Kilbride]] | |||
[[File:DOC_SM_Team.png|1000px]] | |||
The work of the department was based around this RCS’s production (mainly for the sourcing of props and creating risk assessments) and a DVD recording of a different production (blocking, cueing, entrances and exits plots, setting- and running lists). More detail will be given on the RCS production, but example of documents created from the DVD can be found below. | |||
'''Props''' | |||
Most of the props could be sourced from RCS's own props store or with the help of NTS and Scottish Opera. Church items such as thuribels were previously borrowed for [[Glory on Earth]], so could hopefully be used again. A lot of the church props would makes by the props department anyway. | |||
A lot of time was spent trying to think of different ways to make and source things instead of just jumping on the first link and buying it. An example for thinking outside the box, is [[How To Make A Fake Brick]]. Instead of buying a brick or a fake brick, the ASM thought about ways to make one that could be thrown safely while still being safe and made a mock-up of their idea with what they had laying around the house. | |||
'''Risk Assessments''' | |||
This was a fairly low-risk production with the main risk being the revolve. Other risk assessments were written for food an liquid, glassware and naked flame. | |||
(INSERT RISK ASSESSMENTS HERE JESS) | |||
'''Other documents ''' | |||
The ASM's were tasked with creating props tracking documents as can be seen below: | |||
<pdf>DOC_Propstracking.pdf</pdf> | |||
These documents were helpful when later on creating the virtual propsshelves for stage right and stage left: | |||
<pdf>DOC Propstable SR.pdf</pdf> | |||
<pdf>DOC Propstable SL.pdf</pdf> | |||
The third year ASM gave a score reading class and created a paperclip page on [[Setting up a score for Opera]] before all of the ASM’s tried cueing the singers on. Information on who would enter when and where can be found on the entrance and exit plot. <pdf>DOC_Ent+Ex.pdf</pdf> | |||
=Sound= | |||
Sound requirements for this show were somewhat small. Foldback for playback from the pit was required. There were 2 bars on stage for foldback – CW 22 and CW 7 with two D&B E3’s on each bar. (See Plan). | |||
<pdf>DDC_Speaker_Plan.pdf</pdf> | |||
As for comms and cameras in this show a camera was going to be positioned on bar 15, centre stage, to show the automation operator a birds eye view of the revolve. There would have also been a maestro camera positioned in the pit being sent to the DSM and any other areas BS with extra monitors being rigged if required. | |||
A quote for wireless comms was got from the warehouse. The hire period was from 04/05/2020 To - 25/05/2020 for the FreeSpeak II 5 Beltpack Kit. | |||
A small amount of micing would have been required from the pit for the foldback on stage. There would have been 2 mics – one left and one right – of the maestro, rigged on hex clamps and a discussion would have been had with the maestro about whether or not further micing would have been necessary on other instruments. | |||
=Lighting= | |||
'''Design''' | '''Design''' | ||
LX Design key features include the 3m BP screen in the crossover, which was to be backlit as a blinder,LED tape overlaying the 'cross' in the chapel structure, and the Truss grid suspended centre over the revolve. This was to account for any rotation of the revolve, and even if FOH/side positions would not reach we could still light the interior of the revolve. | |||
<pdf>Opera 2 2020 LX 3 sheets.pdf</pdf> |
Latest revision as of 08:05, 19 October 2020
Overview
Stage Department
The Team
Head Of Stage Sean Ramsay
Head Of Flys and Automation Darren Wilson
Deputy Head Of Stage Noah Dates
Stage Technician Kyle Jessiman
Weekly Break Down
To help show each member of the team the tasks to be completed and when a document was produced by the Head Of Stage detailing all the activities and would be carrying them out. This would also help with tracking our progress over the fit up to see how we were working with the available time.
Ground Plan
Sliding Front Cloth There was two front cloths for this show one that would fly up and down and another that would slide with a center stage split. The sliding cloth would have a hard masker as a leading edge so using one track we had to make sure that when it was full open the maskers were off stage. All the components that would be used to make this work were drawn up and added to a vectorworks drawing to give an accurate representation of what would be put up on the stage.
Sliding Back Wall There was a sliding back wall panel that to track Stage Left in the middle of Act 3 as discreetly as possible. The wall would be set up in a dead hang system with our Flyman as the operator. Using a series of pulleys, the lines would be diverted to the Flyfloor for our Flyman to pull down. This would trigger a weight bag that we have put below the ladder on Stage Left to lower and pull the wall panel with it. The panel will be tracked and there will be a guide attached to it at the top. he guide will be a wire rope tensioned across two of the pillars on the back wall with a tirfor winch. The wall will be attached to this guide using a screw eye that will be placed in the top of the wall panel. The Vectorworks drawing that compliments this description has been added for perusal, giving a concise representation of what we would have built onstage.
Equipment
Two kit lists were produced for the stage department for this show, One of them was for flys and automation with the other for the stage. Having two lists helped to split up who was needing what equipment and also saved issues if we both tried to makes updates at the same time. The lists have been broken down into section that they should be prepped as and labelled making it easier when fitting up on the stage.
Health And Safety
Pre Show Checks
With all 4 team members having different tasks during the pre show time everyone had a different list with all moving aspects of the show needing checked fully. Meaning all revolve cues would be run daily before each show to test it as it would be run but also for the operator to get the feel of the control. We also needed to check all flying and automation pieces along with the sliding back wall panel and the various parts to that.
Flys & Automation
Head of Flys & Automation Darren Wilson
The show has very little flown aspects to it, with the majority of counterweight bars being used for the LX overhead rig. The only flown element during the show is a Full Black downstage.
As part of the LX design it was requested that there be a truss flown above the revolve, due to the size of the required truss it was decided the truss should be flown on 4 Big Tow winches as the truss was too small to drop chain hoist points down the grid wells and we wanted to avoid removing grid panels and bridles. The LX truss had to be dead hung from a mother grid (with the mother grid being flown on the Big Tow winches) as we couldn't get the 2 downstage points of the LX truss with the winches due to the no fly zones. Above the Mother Grid there will be a Counterweight bar that will be attached to the LX truss with a drift and some half couplers with eye bolts, this is for the cable run, 2 extra weights will be put in the cradle and the brake will be let off to allow the bar to run in and out when the LX truss moves on automation.
There is a 16.5m truss span downstage that holds the track for the sliding masking. The truss is rigged on 4 Loadgaurd chain motors and is strapped of the fly floors.
There is also a 5m FOH truss rigged of catwalk 1.
Flys Bible
Automation Plot
Action Plan
Points Plan
Points Master
Grid Plan
Stage Management
The team
Stage Manager: Jessica McKay
Deputy Stage Manager: Fiona Elliott
Senior Assistant Stage Manager: Nele Hähnsen
Assistant Stage Manager: Alexandra McKenna
Assistant Stage Manager: Coral Nelson
Assistant Stage Manager: India Kilbride
The work of the department was based around this RCS’s production (mainly for the sourcing of props and creating risk assessments) and a DVD recording of a different production (blocking, cueing, entrances and exits plots, setting- and running lists). More detail will be given on the RCS production, but example of documents created from the DVD can be found below.
Props
Most of the props could be sourced from RCS's own props store or with the help of NTS and Scottish Opera. Church items such as thuribels were previously borrowed for Glory on Earth, so could hopefully be used again. A lot of the church props would makes by the props department anyway. A lot of time was spent trying to think of different ways to make and source things instead of just jumping on the first link and buying it. An example for thinking outside the box, is How To Make A Fake Brick. Instead of buying a brick or a fake brick, the ASM thought about ways to make one that could be thrown safely while still being safe and made a mock-up of their idea with what they had laying around the house.
Risk Assessments
This was a fairly low-risk production with the main risk being the revolve. Other risk assessments were written for food an liquid, glassware and naked flame.
(INSERT RISK ASSESSMENTS HERE JESS)
Other documents
The ASM's were tasked with creating props tracking documents as can be seen below:
These documents were helpful when later on creating the virtual propsshelves for stage right and stage left:
The third year ASM gave a score reading class and created a paperclip page on Setting up a score for Opera before all of the ASM’s tried cueing the singers on. Information on who would enter when and where can be found on the entrance and exit plot.
Sound
Sound requirements for this show were somewhat small. Foldback for playback from the pit was required. There were 2 bars on stage for foldback – CW 22 and CW 7 with two D&B E3’s on each bar. (See Plan).
As for comms and cameras in this show a camera was going to be positioned on bar 15, centre stage, to show the automation operator a birds eye view of the revolve. There would have also been a maestro camera positioned in the pit being sent to the DSM and any other areas BS with extra monitors being rigged if required.
A quote for wireless comms was got from the warehouse. The hire period was from 04/05/2020 To - 25/05/2020 for the FreeSpeak II 5 Beltpack Kit.
A small amount of micing would have been required from the pit for the foldback on stage. There would have been 2 mics – one left and one right – of the maestro, rigged on hex clamps and a discussion would have been had with the maestro about whether or not further micing would have been necessary on other instruments.
Lighting
Design
LX Design key features include the 3m BP screen in the crossover, which was to be backlit as a blinder,LED tape overlaying the 'cross' in the chapel structure, and the Truss grid suspended centre over the revolve. This was to account for any rotation of the revolve, and even if FOH/side positions would not reach we could still light the interior of the revolve.