The lighting for the Ballet Showcase 2015 was typical of many dance shows with 5m booms behind each hard masker with lights at shin height, mid body height (about 1.5m up) and head height, to cover the entire body. The FOH rig was minimal as very little front light is required for dance, with a simple warm and cold wash being more than sufficient. Colorado Quad Pars were hired for the tops of the booms to provide a more extensive colour wash and supplement the Rush Pars which were rigged overhead and used as a full stage, colour changing wash. | |||
====OH Plan==== | |||
<pdf>OH_Ballet_2015_v.5.pdf</pdf> | |||
====FOH Plan==== | |||
<pdf>FOH_Ballet_2015_v.5.pdf</pdf> | |||
====Boom Plan==== | |||
<pdf>Ballet Boom Plan 2015.pdf</pdf> | <pdf>Ballet Boom Plan 2015.pdf</pdf> |
Revision as of 15:51, 9 June 2015
Show Dates
5th June - 6th of June 2015
Production Team
- Production Manager - Malcolm Stephen
- Stage Manager - Siobhán Scott
- Deputy Stage Manager - Eve Kerr
- Technical Stage Manager - Daniel Thompson
- Deputy Technical Stage Manager - Rory Boyd
- Lighting Designer - Laura Mason
- Chief Production Electrician - Richard Lyons
- Electricians - Calum Paterson, Jamie Ford
- LX Programmer - Calum Paterson
- Sound 1 - Jamie Ford
Technical Stage Management
The stage for ballet consisted of 4 main elements - The Dance Floor, Masking, a White Gauze and the BP Screen. We tried to use full width (16m) bars as much as possible for the show, in an attempt to minimise gaps in the masking.
The House Tabs were used at the Top, Interval, and End of each performance. A full black was brought in in between each dance for a cast change behind it.
Ground Plans
Masking
Grid Points
Fly Plot
Lighting Design
The lighting for the Ballet Showcase 2015 was typical of many dance shows with 5m booms behind each hard masker with lights at shin height, mid body height (about 1.5m up) and head height, to cover the entire body. The FOH rig was minimal as very little front light is required for dance, with a simple warm and cold wash being more than sufficient. Colorado Quad Pars were hired for the tops of the booms to provide a more extensive colour wash and supplement the Rush Pars which were rigged overhead and used as a full stage, colour changing wash.
OH Plan
FOH Plan
Boom Plan