Into The New 2016

From paperclip
Jump to navigation Jump to search


Into The New 2016
Performance Time
Performance Dates January 11th, 12th, 13th, 14th
Stats
Venue Pearce Institute, Govan
Creative Team
Technical Manager Daniel Thompson
Head of Lighting Alex Kilgour
Head of Sound Hannah Allan
Stage Manager Amy Donaldson


Into The New is a festival run every year for the graduating year of CPP students. This year the festival was held in the Pearce Institute, Govan.

Production Team

Production Manager Stephen Roe

Stage Manager Stephen Moffat

Stage Manager Amy Donaldson

Technical Manager Daniel Thompson

Venue Crew Patrick Hepplewhite, Rachel Wells, Chris Brown

Head of Lighting Alex Kilgour

Head of Sound Hannah Allan

Venue Design

Kit Allocations

All spaces shared access to microphones, DI boxes, cables etc. There were no wireless microphones available. There was no overhead rigging in the Room 33, Vestibule or MacLeod Hall spaces.

All tech allocations were subject to change and the requirements of the pieces.

Mary Barbour

- Stage 600mm High, Area 6.1m x 2.4m with truss rig, masking and backstage area

- 2 Wind-up LX Bar

- 8 500W Fresnel

- 2 S4 LED Lustr+

- 2 Chauvet LED Wash

- 4 'Birdie'

- 8 LED Par

- Hazer

- Smoke Machine

- Zero88 Jester ML Lighting Desk

- Stereo Sub/Mid-top Sound System with Digital Desk

- Venue Projector

Vestibule

- Stage 400mm High, Area 7.3m x 2.4m

- 4 Wind-up LX Bar

- 4 500W Fresnel

- 2 S4 LED Lustr+

- 4 LED Par

- Hazer shared with MacLeod Hall

- Zero88 Juggler Lighting Desk

- Basic Stereo Sound System with Anologue Desk

MacLeod Hall

- Stage 600mm High, Area 7.3m x 2.4m with masking and backstage area.

- 4 Wind-up LX Bar

- 4 500W Fresnel

- 2 S4 LED Lustr+

- 4 LED Par

- Hazer shared with Vestibule

- Zero88 Juggler Lighting Desk

- Basic Stereo Sound System with Anologue Desk

- Basic Data Projector

- 10' x 7.6" Fast Fold BP Screen

- Shared storage space for set etc

Room 33

- 2 'Birdie'

Hub Space

- 2 Pixeline

- 2 Eurolite LED Bar2 RGBA

- 5 Stairville MH100 LED Beam Moving Light

- 4 Chauvet LED Wash

- Chamsys Laptop

Full Equipment List

Rigging

  • 17 x 8' x 4' Steel Deck
  • 44 x 600mm Deck Legs
  • 24 x 400mm Deck Legs


  • 5 x Pipe & Drape H
  • 6 x Pipe & Drape V
  • 6 x Pipe & Drape Base


  • 4 x 7m x 4.8m Drape
  • 2 x 1.8m x 4.8m Drape


  • 4 x ARRI 3.6m Wind Up Stand
  • 2 x Manfrotto 3.6m Wind Up Stand
  • 6 x T Bar


  • 6 x Stage Weight


  • 16 x H30V 1m
  • 6 x H30V 3m
  • 4 x H30V Box Corner
  • 4 x H30V Base

Power

  • 19 x 13a-IEC Jump
  • 14 x 13a 4 Way
  • 36 x 13a-16a Jump
  • 6 x 13a-15a Jump
  • 6 x 15a Grelco
  • 6 x 15a-16a Jump
  • 6 x 15a-IEC Jump
  • 6 x 16a Trelco


  • 8 x 13a 10m
  • 10 x 13a 5m
  • 10 x 15a 10m
  • 20 x 15a 5m
  • 10 x 16a 10m
  • 20 x 16a 5m
  • 1 x 32a 5m
  • 1 x 32a-4x16a Rubber Box

Lighting

  • 2 x Zero88 Juggler
  • 1 x Zero88 Jester ML
  • 1 x Chamsys Dongle


  • 10 x 3 pin to 5 pin
  • 10 x 3m 5 pin DMX
  • 20 x 5m 5 pin DMX
  • 5 x 10m 5 pin DMX
  • 5 x 20m 5 pin DMX


  • 16 x LED Par
  • 6 x Chauvet Core 3x1
  • 4 x James Thomas Pixeline 1044
  • 6 x Source4 Lustr+
  • 16 x Selecon Acclaim Fresnel 500W
  • 6 x Par16 'Birdie'


  • 6 x ETC Smart Module
  • 4 x Zero88 Alpha Pack II


  • 6 x ETC Source4 Iris


  • 1 x Look Solutions Viper Smoke Machine
  • 2 x Look Solutions Unique Hazer

Sound

  • 2 x RCS Sound Kit
  • 1 x Yamaha LS9
  • 3 x Crown K2 Amp
  • 4 x EAW Speakers
  • 2 x EV Speakers
  • 2 x D&B Max12
  • 2 x D&B Max15
  • 2 x Tannoy Lepoard
  • 2 x Tannoy Panther


  • 2 x Shure Beta 58
  • 4 x Shure SM58
  • 6 x Active DI
  • 1 x Stereo DI


  • 4 x Jack to Male XLR
  • 4 x Jack to Female XLR
  • 2 x 50m XLR
  • 10 x 10m XLR
  • 10 x 5m XLR
  • 4 x 20m NL4
  • 4 x 10m NL4
  • 4 x 5m NL4
  • 4 x NL4 Coupler

AV

  • 8 x Assorted Length VGA Cables
  • 1 x VGA Cable 20m
  • 2 x VGA Cable 15m


  • 1 x Extron 6 Input Video Mixer
  • 2 x 8 Way VGA Splitter


  • 2 x Data Projector


  • 1 x 10' x 7.6' Fast Fold Screen
  • 10 x VGA Monitor
  • 1 x 32 inch LCD Screen