Into The New 2016
Into The New 2016 | |||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Into The New is a festival run every year for the graduating year of CPP students. This year the festival was held in the Pearce Institute, Govan.
Production Team
Production Manager Stephen Roe
Stage Manager Stephen Moffat
Stage Manager Amy Donaldson
Technical Manager Daniel Thompson
Venue Crew Patrick Hepplewhite, Rachel Wells, Chris Brown
Head of Lighting Alex Kilgour
Head of Sound Hannah Allan
Venue Design
Kit Allocations
All spaces shared access to microphones, DI boxes, cables etc. There were no wireless microphones available. There was no overhead rigging in the Room 33, Vestibule or MacLeod Hall spaces.
All tech allocations were subject to change and the requirements of the pieces.
Mary Barbour
- Stage 600mm High, Area 6.1m x 2.4m with truss rig, masking and backstage area
- 2 Wind-up LX Bar
- 8 500W Fresnel
- 2 S4 LED Lustr+
- 2 Chauvet LED Wash
- 4 'Birdie'
- 8 LED Par
- Hazer
- Smoke Machine
- Zero88 Jester ML Lighting Desk
- Stereo Sub/Mid-top Sound System with Digital Desk
Vestibule
- Stage 400mm High, Area 7.3m x 2.4m
- 4 Wind-up LX Bar
- 4 500W Fresnel
- 2 S4 LED Lustr+
- 4 LED Par
- Hazer shared with MacLeod Hall
- Zero88 Juggler Lighting Desk
- Basic Stereo Sound System with Anologue Desk
MacLeod Hall
- Stage 600mm High, Area 7.3m x 2.4m with masking and backstage area.
- 4 Wind-up LX Bar
- 4 500W Fresnel
- 2 S4 LED Lustr+
- 4 LED Par
- Hazer shared with Vestibule
- Zero88 Juggler Lighting Desk
- Chamsys Laptop
- Basic Stereo Sound System with Anologue Desk
- Basic Data Projector
- 10' x 7.6" Fast Fold BP Screen
- Shared storage space for set etc
Room 33
- 2 'Birdie'
Hub Space
- 2 Pixeline
- 2 Eurolite LED Bar2 RGBA
- 5 Stairville MH100 LED Beam Moving Light
- 4 Chauvet LED Wash