Dialogues des Carmélites 2020
Overview
Stage Department
The Team
Head Of Stage Sean Ramsay
Head Of Flys and Automation Darren Wilson
Deputy Head Of Stage Noah Dates
Stage Technician Kyle Jessiman
Weekly Break Down
To help show each member of the team the tasks to be completed and when a document was produced by the Head Of Stage detailing all the activities and would be carrying them out. This would also help with tracking our progress over the fit up to see how we were working with the available time.
Ground Plan
Sliding Front Cloth
Sliding Back Wall
Equipment
Health And Safety
Pre Show Checks
Flys & Automation
Head of Flys & Automation Darren Wilson
The show has very little flown aspects to it, with the majority of counterweight bars being used for the LX overhead rig. The only flown element during the show is a Full Black downstage.
As part of the LX design it was requested that there be a truss flown above the revolve, due to the size of the required truss it was decided the truss should be flown on 4 Big Tow winches as the truss was too small to drop chain hoist points down the grid wells and we wanted to avoid removing grid panels and bridles. The LX truss had to be dead hung from a mother grid (with the mother grid being flown on the Big Tow winches) as we couldn't get the 2 downstage points of the LX truss with the winches due to the no fly zones. Above the Mother Grid there will be a Counterweight bar that will be attached to the LX truss with a drift and some half couplers with eye bolts, this is for the cable run, 2 extra weights will be put in the cradle and the brake will be let off to allow the bar to run in and out when the LX truss moves on automation.
There is a 16.5m truss span downstage that holds the track for the sliding masking. The truss is rigged on 4 Loadgaurd chain motors and is strapped of the fly floors.
There is also a 5m FOH truss rigged of catwalk 1.
Flys Bible
Automation Plot
Action Plan
Points Plan
Points Master
Grid Plan
Stage Management
Sound
Lighting
Design