CPP 1 & 4 2021
Summary
Lighting
Sound
Production Sound
Sound Plan
This was the plan used for the fit-up.
Kit Requirements
This was all the kit used on CPP1&4, we found we needed more than originally expected with this show due to the time for shows to be realised in venue and the changes that required after that.
Kit List
Battery Requirements
XLR Requirements
Collection List
Power
This is the power documentation produced to make sure we had enough resources in the room to run our system.
Power Requirements
Power On/Off Procedure
Scheduling
These are the Schedules used by the Sound Dept on this show.
Team Schedule
Fit up
Get Out