Attempts On Her Life: Difference between revisions

From paperclip
Jump to navigation Jump to search
Jhamilton (talk | contribs)
No edit summary
Jhamilton (talk | contribs)
Line 49: Line 49:


==Stage==
==Stage==
Our main technical challenge was to create a 7000 x 7000 truss grid which we would use to hang a 'cloud' of items from.
The main technical challenge was to create a 7000 x 7000 grid which we would use to hang a 'cloud' of items from. To do this I used a box truss configuration with a combination of tensioned drifts and cord. Below is how thegrid was hung and the equipment used.
 
'''HANGING THE TRUSS'''
 
The equipment used to hang the grid was:
 
 
6x Loadguard LG50 Chain Hoist (SWL 500kg)
6x 1m Strop
6x 4m Strop
12x 3 1/4T Bow Shackle
 
The strops were chocked over the top red beam of the catwalk, this let the motor hang just below the bottom catwalk beam.
 
'''MAKING THE WIRE GRID'''
 
The wire grid needed as many places to hang items from as possible, therefore a lot of rigging was required to make the grid squares as small as was reasonably possible.
 
The final solution was a bottom layer of horizontal drifts tensioned by a turnbuckle. The vertical lines were 6mm braided cord tensioned with a truckers hitch. This solution had minimal sag and gave us an ideal amount of hanging points to work with.
 
Equipment used:
 
21 x 6m Drift
42 x 2.5m 6mm Braided Cord
44 x 0.5m Strop
22 x Turnbuckle
54 x 1T Bow Shackle
12 x 1.5T Bow Shackle


<pdf>AOHL_Paperclip_PDF.pdf</pdf>
<pdf>AOHL_Paperclip_PDF.pdf</pdf>


To do this we assembled a box truss structure with drifts (tensioned with turnbuckles) across the horizontal, and 8mm braided cord across the vertical.


<pdf>AOHL_Grid_PDF.pdf</pdf>
<pdf>AOHL_Grid_PDF.pdf</pdf>


The items were then hung from the grid with 1mm 2mm and 4mm braided cord.
The items were then hung from the grid with 1000m of braided cord. A combination of 1mm, 2mm, and 4mm was used depending on the weight of the item. Heavier objects were hung from multiple points to prevent any failures.


[[File:AOHL Production 1.jpeg]]
[[File:AOHL Production 1.jpeg]]


The seating for the show was arranged in a random scattered pattern. For fire safety reasons we tethered the chairs to the floor. To do this we took cord under the seat of the chair and attached each end of the cord to the floor with a screw and penny washer.
The seating for the show was arranged in a random scattered pattern. For fire safety reasons we tethered the chairs to the floor. To do this we took cord under the seat of the chair and attached each end of the cord to the floor with a screw and penny washer.
Below is the risk assessment for the scattered seating. This risk assessment was revised a few times to make sure that Venues were happy it met the Chandler's health and safety requirements, and that my production manager was happy it allowed us to achieve what the director wanted.

Revision as of 11:54, 11 January 2019


Attempts On Her Life
Production Information
Performance Dates
30th October - 3rd November 2018
Venue
Chandler Studio Theatre
Creative Team
Director
Guy Hollands
Designer
Lighting Designer
Sound Designer
Production Team
Production Manager
Kevin Murray
Production Electrician
Deputy Production Electrician
[[Lewis Douglas]
Lighting Programmer and Operator
Stage Manager
Deputy Stage Manager
Assistant Stage Managers
Stage Supervisor
Deputy Stage Supervisor
Sound Operator


Stage

The main technical challenge was to create a 7000 x 7000 grid which we would use to hang a 'cloud' of items from. To do this I used a box truss configuration with a combination of tensioned drifts and cord. Below is how thegrid was hung and the equipment used.

HANGING THE TRUSS

The equipment used to hang the grid was:


6x Loadguard LG50 Chain Hoist (SWL 500kg) 6x 1m Strop 6x 4m Strop 12x 3 1/4T Bow Shackle

The strops were chocked over the top red beam of the catwalk, this let the motor hang just below the bottom catwalk beam.

MAKING THE WIRE GRID

The wire grid needed as many places to hang items from as possible, therefore a lot of rigging was required to make the grid squares as small as was reasonably possible.

The final solution was a bottom layer of horizontal drifts tensioned by a turnbuckle. The vertical lines were 6mm braided cord tensioned with a truckers hitch. This solution had minimal sag and gave us an ideal amount of hanging points to work with.

Equipment used:

21 x 6m Drift 42 x 2.5m 6mm Braided Cord 44 x 0.5m Strop 22 x Turnbuckle 54 x 1T Bow Shackle 12 x 1.5T Bow Shackle


The items were then hung from the grid with 1000m of braided cord. A combination of 1mm, 2mm, and 4mm was used depending on the weight of the item. Heavier objects were hung from multiple points to prevent any failures.

The seating for the show was arranged in a random scattered pattern. For fire safety reasons we tethered the chairs to the floor. To do this we took cord under the seat of the chair and attached each end of the cord to the floor with a screw and penny washer.

Below is the risk assessment for the scattered seating. This risk assessment was revised a few times to make sure that Venues were happy it met the Chandler's health and safety requirements, and that my production manager was happy it allowed us to achieve what the director wanted.