Project 360: Difference between revisions
Jump to navigation
Jump to search
Line 70: | Line 70: | ||
==Rigging== | ==Rigging== | ||
===Circle=== | ===Circle=== | ||
4 x 500KG Loadguard Chain Hoist | |||
9.2m Diameter H30V Truss Circle (8 Segment) | |||
4 x 0.5m H30V Straight Truss Section | |||
4 x 0.25m H30V Straight Truss Section | |||
===Tunnel=== | ===Tunnel=== | ||
Line 76: | Line 84: | ||
4 x Multiway Corners | 4 x Multiway Corners | ||
7m Truss Tunnel (Built from H30V) | |||
2 x Half Tab |
Revision as of 21:28, 12 March 2015
File:360logo.png | ||
Creative & Production Teams | ||
---|---|---|
Production Manager / Head of Creative Team | Rory Boyd | |
Head of Video Systems | Neil Smith | |
Technical Manager / Lighting Programmer | Daniel Thompson | |
Stage Manager | Sam Wright | |
Sound Designer | Hannah Allan | |
Onsite Technical Support | Fraser Walker / Fix8 Group | |
Head Content and Graphic Designer | Rory Boyd | |
Content Support | Hannah Smith Ben Hunter Fergus Thom Louise Dawson | |
Equipment Hire from | Fix8 Group [NL Productions] [VER] | |
Stats | ||
Venue | AGOS Studio Theatre |
Project 360 was a fully immersive, 360 degree cinema and performance venue, created for 1 week in the Royal Conservatoire of Scotland.
About
Measuring 10m in diameter, Project 360 consisted of a 30m long cyc, which was projected onto using 4 projectors. The screen wrapped around the audience, allowing the venue to change from hosting Shakespeare to musicals in an instant. The project was one of the most ambitious video projects ever undertaken in Scotland.
Equipment
Video
Projection
Control
LX
Lantern Stock
Control
Sound
Audio Kit
Control
Rigging
Circle
4 x 500KG Loadguard Chain Hoist
9.2m Diameter H30V Truss Circle (8 Segment)
4 x 0.5m H30V Straight Truss Section
4 x 0.25m H30V Straight Truss Section
Tunnel
4 x Base Plate
4 x Multiway Corners
7m Truss Tunnel (Built from H30V)
2 x Half Tab