Takin' Over The Asylum: Difference between revisions

From paperclip
Jump to navigation Jump to search
Sscott3 (talk | contribs)
Sscott3 (talk | contribs)
Line 59: Line 59:


The set was made up of exhibition-style flats that were able to be pin-hinged together. To achieve the desired 'Letter Box' look, the entire set sat upon 400mm steel deck and was framed with Hard Maskers. The steel deck became an advantage as we could bolt through it to support certain flats. [[File:Asylum_Set.jpg|300px|thumb|left|3 main areas, SL led to an outside railing]][[File:Asylum_Set_Wide_View.jpg|300px|thumb|left|Wide view of the set]]  
The set was made up of exhibition-style flats that were able to be pin-hinged together. To achieve the desired 'Letter Box' look, the entire set sat upon 400mm steel deck and was framed with Hard Maskers. The steel deck became an advantage as we could bolt through it to support certain flats. [[File:Asylum_Set.jpg|300px|thumb|left|3 main areas, SL led to an outside railing]][[File:Asylum_Set_Wide_View.jpg|300px|thumb|left|Wide view of the set]]  
There were many technical elements to the show making it a busy show and stressful tech. <pdf>Markup.pdf</pdf> <pdf>AsylumKitList.pdf</pdf>
There were many technical elements to the show making it a busy show and stressful tech. <pdf>Markup.pdf</pdf> <pdf>Flat_Annotations.pdf</pdf><pdf>AsylumKitList.pdf</pdf>


==Sugar glass==
==Sugar glass==

Revision as of 17:18, 8 June 2022


Takin' Over The Asylum
Summary
Dates
26th May 2022 - 28th May 2022
Performance Course
Third Year BA Acting
Location
Chandler Studio Theatre
Creative Team
Director
Designer
Sound Designer
Lighting Designer
Production Team
Stage Manager
Deputy Stage Manager
Assistant Stage Manager
Head of Stage
Stage Technician
LX Programmer
PLX
Production Sound Engineer
Sound No. 2




Overview

Stage Management

Technical Stage Department

The set was made up of exhibition-style flats that were able to be pin-hinged together. To achieve the desired 'Letter Box' look, the entire set sat upon 400mm steel deck and was framed with Hard Maskers. The steel deck became an advantage as we could bolt through it to support certain flats.

3 main areas, SL led to an outside railing
Wide view of the set

There were many technical elements to the show making it a busy show and stressful tech.

Sugar glass

The sugar Glass smash at the end of act 1 was certainly a highlight of the show. The glass was broken during the show using an emptied, yet real, fire extinguisher.


Window

Performer Flying

Lighting

Sound

This show made use of the amazing set, by going for as much naturalism as possible. This meant the sound design had to head in the direction of realism and this started with speaker placement. This was achieved with two KV2 EX6s in the far L and R as a main PA, to be used exclusively for transitions states. Three KV2 ESD12s in a L,C,R position just slightly behind the main PA, these were for very specific spot effects and positional ambiences. On top of this we had two KV2 subs on the Catwalks for transition music.

File:TOTA PRS Form 1.pdf File:SC13.jpg File:SC11.jpg

Photos

https://flickr.com/photos/194465393@N05/albums/72177720299267791/with/52099862112/