Balm In Gilead 2017: Difference between revisions

From paperclip
Jump to navigation Jump to search
Hmckennan (talk | contribs)
Hmckennan (talk | contribs)
Line 110: Line 110:
The technical requirements of this show for TSM were very minimal. The set was static and made up of 4 flats, a bar and some tables and booths. Our main technical challenges were to lift the 6mm ply flooring on catwalks 2 & 3 and bridle through the catwalk metal grate to rig some "steel" girders which framed the set.
The technical requirements of this show for TSM were very minimal. The set was static and made up of 4 flats, a bar and some tables and booths. Our main technical challenges were to lift the 6mm ply flooring on catwalks 2 & 3 and bridle through the catwalk metal grate to rig some "steel" girders which framed the set.


[[:File:Balm in Gilead Ground Plan .pdf]]


Removal of Catwalk Panel Procedure
 
Removal of Catwalk Panel Procedure [[:File:Floor Removal Process.docx]]





Revision as of 11:36, 17 November 2017


Balm In Gilead
Production Balm In Gilead
Performance Time
Performance Dates Tuesday 31st October 2017 - Friday 3rd November 2017
Stats
Venue Chandler
Creative Team
Director Mark Thomson
Designer Katy Meehan
Lighting Designer Calum Dunbar
Sound Designer Andrew Jackson


Production Team
Production Manager Colin Bell
Stage Manager Yvonne Carruthers
Assistant Stage Managers Simon McEwan Andrew Johnston
Deputy Stage Manager Laurie Sutton
Technical Stage Manager Heather McKennan
Deputy Technical Stage Managers Poppy Apter Jak Coventry
Sound No.1 Dylan Hodgson
Production Electrician Jared Hutsby
Deputy Production Electrician James McQueen
Lighting Programmer Karyn Wilson

Overview

When Lanford Wilson wrote Balm in Gilead in 1965, Manhattan was not the New York we know today where only the rich could countenance actually living. He takes us to an all-night cafe populated by the desperate. Prostitutes, hustlers and heroin addicts gather nightly for company, drugs and to make a buck.

Stage Management

How to make a syringe safe for a show by Andrew Johnston

How to make a cigarette packet by Andrew Johnston

[[File:Making of cigarette packets.docx


How to make money Andrew Johnston

File:Making money.docx

Technical Stage Management

The technical requirements of this show for TSM were very minimal. The set was static and made up of 4 flats, a bar and some tables and booths. Our main technical challenges were to lift the 6mm ply flooring on catwalks 2 & 3 and bridle through the catwalk metal grate to rig some "steel" girders which framed the set.

File:Balm in Gilead Ground Plan .pdf


Removal of Catwalk Panel Procedure File:Floor Removal Process.docx


•The designer has requested that to enhance setting and aesthetic of the play that the audience should be able to see through the mesh floor on the catwalks of the Chandler Studio Theatre. This would allow any overhead cabling or rigging to be visible to the audience to help create the ‘run down’ industrial setting they would like.


• There are also two horizontal girders as part of the set design which the designer has asked to have hanging in the centre of catwalks 2 and 3. It was decided that the easiest solution to this would be to rig through the metal grate of the catwalk floors rather than trying to secure them from a point underneath or from the sides. The TSM department will be buying their own steel wire rope to hang the girders with to ensure if the wire rope comes in to contact with the metal grate and is damaged that they can be disposed of after the show run without affecting the venues stock. The wire rope will be attached to bridles that will be rigged in a way which allows the wire to pass through the metal grate without coming in to contact. If it is not possible to prevent this contact then the metal grate will have some burlap or scrap black tat secured over the section the wire is passing through to prevent any contact between them.


Removal Procedure: • All operations carried out with venue and staff supervision. • Lift carpet by rolling from the SR end. • From catwalk level with support from a technician up the tallescope unbolt the first two 6mm ply sections and kick rails. • Lift each section of the 6mm ply with corresponding kick rails starting from the SR side. • The carpet and 6mm ply will then be stored in the scene dock next to or on top of the TSM cage. The TSM department will have cleared this area prior to the catwalk floor removal.


Safety Measures: • As is compliant with RCS policy and the risk assessment for overhead work all crew members will empty pockets and use lanyards to carry tools when working on the catwalks.


Replacement Procedure: • All operations carried out with venue and staff supervision. • Return original piece of 6mm ply across the top of the mesh with original kick rails by re-bolting to the chandler catwalk structure. • Re-lay the carpet on top of the ply and fix into place.

Lighting

Sound

Photos