Inner Space 2014: Difference between revisions
No edit summary |
No edit summary |
||
Line 98: | Line 98: | ||
<br> | <br> | ||
=== LX Rig === | === LX Rig === | ||
The electrics rig was fairly straightforward, the only complexity being the size of the rig. During rigging, the DMX line on LX 4 had to be swapped out as it failed to function.<br> | The electrics rig was fairly straightforward, the only complexity being the size of the rig. During rigging, the DMX line on LX 4 had to be swapped out as it failed to function. Also during the rig it was decided that the US Band boom with the S4 Pars and the onstage set up lighters were not necessary and were therefore cut.<br> | ||
<br> | <br> | ||
'''Equipment'''<br> | '''Equipment'''<br> | ||
[[File:Innerspace2014-Fixture list.jpg|200px]] | [[File:Innerspace2014-Fixture list.jpg|200px]]<br> | ||
''*This equipment list does not account for the booms and on stage floor package being cut*''<br> | |||
Revision as of 11:00, 1 February 2014
Inner Space 2014 | |
---|---|
Inner Space 2014 - Between 2 Wings | |
Performance Time | |
Performance Date | Thursday 30 January 2014 |
Performance Time | 6:30pm |
Stats | |
Venue | New Athenaeum |
Creative Team | |
Designer | Ryan Greenfield, Daniel Thompson |
Lighting Designers | Ryan Greenfield, Alex Kilgour, Bradley Jones |
Sound Designer | Hannah Allan |
Production Team | |
PRODUCTION MANAGER | Ross Pringle |
Stage Manager | Amy Donaldson |
DSM | Astrid Rothmeier |
ASM | Judy Stewart, Riona Gilliland, Kiri Newbery |
TSM | Daniel Thompson |
DTSM/Head Flys | Sean Quinn |
DTSM | Samantha Wright, Rory Boyd, Alex Kilgour, Robert Gear |
PLX | Stephen Cunningham |
DPLX/Programmer | Neil Smith |
DPLX | Laura Mason |
Sound Operator | John McAdie |
Production Arts | Alex Kilgour |
PR/Marketing | Rory Boyd |
About
Inner Space 2014, otherwise known as Between 2 Wings, was a project done by first year PTM students in January 2014.
Design
Script
LX Design
LX PLAN
File:LX Plan - Circuited OH - 1 to 25 A0.pdf
BOOM PLAN
Electrics/Video
The LX rig was primary rigged on the Tuesday, but due to the extent and size of the rig, LX rigging and focussing continued well into Wednesday.
LX Rig
The electrics rig was fairly straightforward, the only complexity being the size of the rig. During rigging, the DMX line on LX 4 had to be swapped out as it failed to function. Also during the rig it was decided that the US Band boom with the S4 Pars and the onstage set up lighters were not necessary and were therefore cut.
Equipment
*This equipment list does not account for the booms and on stage floor package being cut*
TSM
Sound
Thanks
Thanks goes out to the following people for their continued help in this project: