Dream On!

From paperclip
Jump to navigation Jump to search


Stage Crew

The stage was built from 4X8 pieces of steel deck and aluminium deck. The dance floor covered the catwalk part of the stage and the rest was for orchestra. There were two treads added to the front to allow orchestra easy access to the main stage.

Video

BBC Video