Automated Trucks 2013

From paperclip
Jump to navigation Jump to search


Outline

The brief is simple; to create an automated truck that can move from SL to SR and back again. The challenge comes from only being allowed to use one winch to control the truck. Below is a detailed explanation of how to create this effect and how to improve it for a show.

Setup

The setup for this system is very simple and you dont need a lot of equipment. Listed below are the steps to follow to create your automated zip up tower.

1. Make sure your stage is clear of any obstructions where the truck is going to run.
2. Move 1 winch to ether SL or SR so that the drop is going through the gap. Be sure to follow the SSOW for moving the winches
3. Run the line down to stage level.
4. Divert the line to run accross stage using the divert pulley shown below.

5. Using a 1T strop, shackle and masterlink, attach the automation line to your truck. Image Below

6. Using a 1T strop, shackle and masterlink, attach your return line (manilla) using a Bowline or Double Figure of 8 to the other side of your truck. Image Below

7. Attach a pulley to the deck to divert your return line to the bar you will be using. (you may need more than one pulley depending on where the bar and truck is)
8. Fly in the bar you want to use to create the return system.
9. Using a clovehitch, attach the return line to the bar you have chosen to run the return system.
10. Weight the bar running the return system to anything under 200KG. We only used 5 1/2 weights because the truck was not to carry any weight.
11. Take the break off the allocated bar and let it take up the slack in the system.
12. Make sure you leave the break off the bar or else the system wont work!
13. The system is now ready to be tested.

Equipment Used

1 x Stage Technologies Big Tow 200 winch

1 x divert pulley

1 x wedge socket

2 x master links

2 x 1T shackle

2 x 1m strop

2 x pulleys

1 x length of rope NOTE: For our system we needed a minimum of 20m. However, in a different setup, a far longer length may be necessary

1 x counterweight bar (We used bar 30)

5 1/2 x fly weights

Programming

The programming of some cues can be quite lengthy and errors can cause a lot more work. It is important to take your time when programming and make sure you know what you are doing before you start, keep up to date during the programming, then know what will happen when you run the cues.

This is a video of one of the programming sequences that we created with this setup. Youtube

Hints and Tips