King Lear
KING LEAR Fit Up List •Put RSAMD black Tri Lyte truss
•Lower Steel Deck bolted together positioned in centre
•Top Steel Deck on top and bolted on
•Flats positioned, bolted together, screwed to steel deck, cable tied to IWB under gallery.
•Cloths hung by black sash from gallery and IWBs
•Cloths leveled off and tops kept at same height
•LX focus carried out
•Floor cloth laid [Double sided tape and black Dance floor PVC]
•Lay out seating [Traverse]
KING LEAR Required Hardware
•M10 Coach Bolts [10X]
•Cable Ties
•Double Sided Dance floor tape
•Black PVC Dance floor tape
•Black Sash
KING LEAR Strike List •All seats onto trolleys
•Drop all cloths
•Lift and roll floor cloth
•Unscrew flats from steel deck, unclip from IWB, unbolt
•unbolt steel deck remove to backstage
•LX Strike
KING LEAR Van List
13x Soft Hanging Cloths
1x Floor Cloth
3x 1220x2440 Steel Deck [Faced]
2x Hard Flats
Romeo and Juliet
4x Platform Pieces
Selected scaffolding and clamps
Midsummer Nights Dream
5x Scaffolding Lengths [2X 1000mm, 3X 600mm]
2x Kabuki Drops
STOCK BOX
2x Black Gaffa Roll
2x White Gaffa Roll
2x Black/Silver LX Roll
14x Screw Eyes
DeWALT 14.4v Screw Gun [2x Batteries and Charger]
Cable Ties
1x Double-sided tape Roll
2x Stage Weights
Black Sash
2x Scaffolding Swivel Clamps
30 meter Black Absail Rope
15 meter Absail Rope
2x 5 meter Steel Wire Truss Ladders
4x Doughty Hanging Clamp
4x Hard Hats
2x Adjustable Stage Braces
1x Spanset [1 ton]
1x Blue Pulley Block
Calum Willoughby’s Equipment
Rope Access Equipment
Bump Cap
Hard Hat
Steel Toe Capped Boots
Tool Belt
Tool Box
Ground Plans