Dates
24th -27th Jan 2023
Performance Course
Second Year BA Acting
Location
Chandler
Creative Team
Director
Designer
Sound Designer
Lighting Designer
Production Team
Stage Supervisor
Deputy Stage Supervisor
Stage Manager
Deputy Stage Manager
Assistant Stage Managers
PLX
LX Programmer/DPLX
Production Sound Engineer
Technical Stage Technicians
Lighting Technicians
Sound Technicians



Overview

Stage Management

TSD

This show was a fairly simple design with some little special effects for TSD.

Kabuki Drop

The centre section of the back cloth had to drop at the end of Act 1. We achieved this by creating a revolving conduit pipe, held inside staff pipe. The conduit then has many M6 threaded bars along which create the rigging 'hooks' for the cloths. The mechanism to revolve is made from pulleys that create a loop from the kabuki to the operator and back. This allows tension to be kept in one direction, and releasing to happen in the other.

Feather Drops

There were multiple deaths during Lear and each time someone died it required a red feather to fall from the 'sky'. This could have been achieved by dropping manually from the catwalk, but this would require crawling silently back and forth quite quickly in order to hit each position in time. Therefore, we turned to a 'duck drop' method. I decided to go with an electronic system that I designed and created using 3D printing and solenoids. There were 8 drop units each running on their own channels to allow for individual control of all 8 feathers.

Chandelier

The chandelier had to be removable at the interval, LX also had cables running to it since it was a practical. The solution used was to rig the chandelier on a 4mm cord which then passed through multiple diversion pulleys off to the control rooms. This allowed an operator to unclear the cord and lower the chandelier into a crew member ready to receive on stage. There was also an effect that had to shake the chandelier violently, this was achieve with a second thin cord about 500mm below the pulley which would allow the fixture to swing left and right as well as up and down using the original rigging line.


GroundPlans

Lighting