Darren Wilson

From paperclip
Jump to navigation Jump to search
Darren Wilson
Info
Date of Birth 04th June 1997
Course Production Technology & Management
Graduating Year 2021 (RCS Graduate 21)
Specialism Technical Stage Management
Education
Higher Education Royal Conservatoire of Scotland 2018 - 2021

Second Year Technical Stage Student @ RCS

Productions

Third Year

Stage Supervisor The Speculator


Stage Supervisor -Flight-

Head of Flys & Automation Pyro Show 2020

Head of Flys & Automation -Into The Woods-

Second Year

Stage Supervisor/ Head of Flys & Automation (Virtual Project) Ballet Showcase 2020 (Virtual Group A)

Head of Flys & Automation Dialogues des Carmélites 2020


Deputy Stage Supervisor The Rape of Lucretia

Stage Supervisor CPP3 Collaborations 2019

Head of Flys/ Deputy Stage Supervisor Middletown

First Year

Sound Technician Ballet Showcase 2019


Assistant Stage Manager San Diego


LX Technician Sunday in the Park with George


Technical Stage Supervisor Inner Space 2019

Assistant Technical Stage Supervisor Peter Pan

RCS Projects

Kinesys Grid Sled

Conduit Holder

During summer 2019 new drapes and conduit were purchased. In order to keep the now large stock of conduit in order I set about building a holder that would be secured on to the wall. The holder would have sections for 1m, 0.5m and compartments for joiners and bullet ends, an additional Kee clamp support would also be fixed to the wall to hold 2m sections of conduit.


Dance Floor Trolley

As part of our 2nd year construction projects I was tasked with designing a new dance floor trolley that could hold 10 rolls, 4 rolls more than the other trolley. I started by looking at different designs of trolleys that were available to purchase. All of them had their pros and cons but for what we needed the design of our existing trolley- built by Stuart Leech was perfect, although it needed to be higher to fit the extra rolls. After drawing the trolley up on Vectorworks and working out exactly how big it would need to be, i made up a cutting list and was all set to start building however due to Covid 19 I never got the chance to build the trolley but during the summer Matt got it finished.

External Work

Apex Acoustics Sound Services [1]

Five Star Crew [2]

Gallowglass [3]

Other Pages

Self Climbing Truss- Created to list the stock and process of building the self climbing truss structure.

Useful Pages

Animated Knots [4]

Tait [5]

Kinesys [6]

Prolyte Campus [7]

Sixty 82 [8]

Theatre Art Life [9]

Area 4 [10]