Darren Wilson
Darren Wilson | ||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Second Year Technical Stage Student @ RCS
Productions
Third Year
Stage Supervisor The Speculator
-
Equipment Boxes
-
Fit up
-
Truss Build
-
Truss Build
-
Motorbike in Place
-
Set
-
Cast
Stage Supervisor -Flight-
Head of Flys & Automation Pyro Show 2020
Head of Flys & Automation -Into The Woods-
Second Year
Stage Supervisor/ Head of Flys & Automation (Virtual Project) Ballet Showcase 2020 (Virtual Group A)
-
Act 1- Black Masking
-
Act 2- White Masking
-
Act 1- Aperuture
Head of Flys & Automation Dialogues des Carmélites 2020
-
TSD Team
-
Points Plan
Deputy Stage Supervisor The Rape of Lucretia
-
Opera 2 rig
-
Opera 2 set
-
Opera 2
Stage Supervisor CPP3 Collaborations 2019
-
New self climbing towers
-
Fit Up
-
Ready to raise
-
The venue
-
Seating bank
-
The venue
-
Overhead rig
Head of Flys/ Deputy Stage Supervisor Middletown
-
FOH truss
-
Building the bridge
-
Middletown Set
-
Soil trap
-
Tech
-
Middletown Crew
First Year
Sound Technician Ballet Showcase 2019
-
Ballet Cast & Crew 2019
-
Ballet Dreamgirls Set
Assistant Stage Manager San Diego
-
San Diego Props Table
-
San Diego Crew
LX Technician Sunday in the Park with George
-
Fit Up
-
LX Team
-
Overhead Rig
Technical Stage Supervisor Inner Space 2019
-
Inner Space Race Build 2019
-
Inner Space Race 2019'
-
Class of 2021
Assistant Technical Stage Supervisor Peter Pan
-
Peter Pan Set 2018
-
Grid Rig
-
FOH Truss
-
Peter Pan Crew 2018
RCS Projects
Kinesys Grid Sled
-
Routing Complete
-
'
Conduit Holder
During summer 2019 new drapes and conduit were purchased. In order to keep the now large stock of conduit in order I set about building a holder that would be secured on to the wall. The holder would have sections for 1m, 0.5m and compartments for joiners and bullet ends, an additional Kee clamp support would also be fixed to the wall to hold 2m sections of conduit.
-
Building the holder
-
Mounted to the wall
-
Complete
-
New Markers
-
Complete
Dance Floor Trolley
As part of our 2nd year construction projects I was tasked with designing a new dance floor trolley that could hold 10 rolls, 4 rolls more than the other trolley. I started by looking at different designs of trolleys that were available to purchase. All of them had their pros and cons but for what we needed the design of our existing trolley- built by Stuart Leech was perfect, although it needed to be higher to fit the extra rolls. After drawing the trolley up on Vectorworks and working out exactly how big it would need to be, i made up a cutting list and was all set to start building however due to Covid 19 I never got the chance to build the trolley but during the summer Matt got it finished.
-
VW Drawing
-
Built by Matt
-
New Trolley
External Work
Apex Acoustics Sound Services [1]
Five Star Crew [2]
Gallowglass [3]
-
The Steamie Fit Up
-
The Steamie Fit Up
-
M'elodie Centre Hang
-
The Steamie Sound Rig
-
Sean Paul Strike
-
Sean Paul Strike
-
Live at The Links Strike
-
Kaiser Chiefs
-
Private Party Rig
-
Private Party
-
Food Festival Rig
-
M'elodie Line Array
-
Murrayfield Pitch Screen Rig
-
Murrayfield Pitch Screen Rig
-
Private Talent Show
-
Summer Sessions Rig
-
Rewind Rig
-
Rewind Rig
-
M'elodie Line Array- Dundee Fireworks
-
V&A Dundee Private Party
Other Pages
Self Climbing Truss- Created to list the stock and process of building the self climbing truss structure.
Useful Pages
Tait [4]
Kinesys [5]
Prolyte Campus [6]
Sixty 82 [7]
Theatre Art Life [8]
Area 4 [9]