CPP-Red Line
CPP-Red Line | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
____________________________
|
Production Credits
Production Manager Stephen Roe
Stage Management
Stage Manager Jack Hirst
Assistant Stage Manager Maciej Kopka
Electrics
Chief Production Electrician Elleanor Taylor
Deputy Production Electrician Patrick Watson
Stage Electrician Ian Smyth
Lighting Operator and Programmer Elsbeth Watt
Lighting Plan
Sound
Operator Ian Smyth
Sub placement: 2 x Tannoy T40r have been rigged in the middle of cat walk two. The idea behind the placement of the subs is to aid any base that comes from the band and music. There are only two subs, as there is no demand or need for extra bass to come through the front of house mix.
FoH speaker placement: 4 x Tannoy V12 have been rigged as the FoH Mid-Top speakers. Two have been rigged for FoH left and the other two for FoH right. Each pair has been daisy chained. These speakers are to act as the core sound for the show. Due to the size of the venue only 4 FoH speakers are needed. Having FoH left and right, also means there is flexibility for any sound effects, music or band mix needing to come through different sides of the stage. They have also been placed in the middle of catwalk two, due to the set up of the tables and having the room separted sometimes during the performance. The speakers have also been daisy chained diagonally for left and right, as this gives the room more ‘balance’.
Stage Tech
For this show we were required to build a false grid into the venue under the catwalks to allow curtains to be dropped into place during the show.
Hardware used:
Curtains/Drifts (temp) Main Tab (Downstage Bar of Catwalk 3)
- Tab 1200 MM (Chandler Black)
- Tarfor tension drift system
- 2 Beam clamps
- 2 shackles
Divider (Stage Right side – Underneath Catwalk 3)
- Tab (The longer white cyc 7500MM)
- Scaff 6.5M
- 4 strops (1M)
- 5 0.25T shackles
- 5 barrel clamps
Divider (Stage Left Side – Between Catwalk 2 & 1 rolling bar)
- Tab (The shorter white cyc 40500MM)
- Scaff 4.5M
- 2 strops (1M)
- 3 0.25T shackles
- 3 barrel clamps
U/S – D/S Divider (All catwalks)
- Tab (12m Tab)
- Scaff 9.5M
- 6 strops (1M)
- 6 0.25T Shackles
- 6 barrel clamps
Tabs On Permanent Track
- Tab 12M U/S Wall (Ran on permeant triple e track)
- Tab (2 half tabs kimbled together) SR Wing
Other Hardware
- 6 pieces of 1M scaff clamped to scaff bars/lx bars to act as stability
- 16 90 degree fixed scaff clamps