CPP-Red Line
CPP-Red Line | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
____________________________
|
Production Credits
Production Manager Stephen Roe
Stage Management
Stage Manager Jack Hirst
Assistant Stage Manager Maciej Kopka
Electrics
Chief Production Electrician Elleanor Taylor
Deputy Production Electrician Patrick Watson
Stage Electrician Ian Smyth
Lighting Operator and Programmer Elsbeth Watt
Lighting Plan
Sound
Operator Ian Smyth
Stage Tech
For this show we were required to build a false grid into the venue under the catwalks to allow curtains to be dropped into place during the show.
Hardware used:
Curtains/Drifts (temp) Main Tab (Downstage Bar of Catwalk 3)
- Tab 1200 MM (Chandler Black)
- Tarfor tension drift system
- 2 Beam clamps
- 2 shackles
Divider (Stage Right side – Underneath Catwalk 3)
- Tab (The longer white cyc 7500MM)
- Scaff 6.5M
- 4 strops (1M)
- 5 0.25T shackles
- 5 barrel clamps
Divider (Stage Left Side – Between Catwalk 2 & 1 rolling bar)
- Tab (The shorter white cyc 40500MM)
- Scaff 4.5M
- 2 strops (1M)
- 3 0.25T shackles
- 3 barrel clamps
U/S – D/S Divider (All catwalks)
- Tab (12m Tab)
- Scaff 9.5M
- 6 strops (1M)
- 6 0.25T Shackles
- 6 barrel clamps
Tabs On Permanent Track
- Tab 12M U/S Wall (Ran on permeant triple e track)
- Tab (2 half tabs kimbled together) SR Wing
Other Hardware
- 6 pieces of 1M scaff clamped to scaff bars/lx bars to act as stability
- 16 90 degree fixed scaff clamps