Genie Trap

From paperclip
Revision as of 14:26, 9 January 2012 by Fnisbet (talk | contribs)
Jump to navigation Jump to search

Operating Genie Trap

This is how the genie trap was put in place for Aladdin Panto 2011

The first thing that was done as part of the panto fit up was to lower the genie trap into place. The first that needed done was to find where the center point of the genie trap slider would be on stage, and make a bridal on the grid above this point. We made this using beam clamps and clutch chains. A shackle was then attached to the hook of the chain hoist and a rope dropped down to lift it up and attach to the point on the bridal.

Four slings were wrapped around the lid of the genie trap as this needed to be lifted on top of the genie trap mechanism and bolted on before it was lowered into the pit.

Once the lid was bolted on, ropes were attached to the genie trap to help guide it and the chain hoist (operated from the tallescope) was used to lift the genie trap off the ground slightly. On the first attempt at lowering it down, only one piece of staging was removed, which at the time seemed enough, but whilst lowering it we found that the trap had to be moved up and down stage to fit in; so the genie trap was lifted out again and another piece was taken out.

Just before getting it into its final position, packers needed placed between the beams in the stage and the trap to make it level with the stage. In the pit, a piece of 8by4 steel deck was placed underneath it with small screw jacks, to be able to change the height of the legs so the genie trap wasn't just floating in the pit.