Self Climbing Truss
In November 2019 RCS purchased 4 Sixty82 Model M Self Climbing Truss Towers.
Total Stock
M29S Box Truss 3m x 16
M29S Box Truss 2m x 8
M29S Box Truss 1m x 4
M29S Box True 0.5m x 4
M29S Box Truss Safety System 1m x 4
M29S Box Truss Safety System Pin x 4
M10 Sleeve Block (470x398mm) x 4
M9 Head Section x 4
M04 Aluminium Base x 4
Motor Attachment Bracket x 4
M11 Short Outrigger x 16
Modular Hinge Set x 16
M51 Female Coupler x 32
Conical Coupler (EGG) 120
M03 M Series Spigot x 268
M05 M Series R-Spring x 268
12mm Black Packer x 16
Tower Components
5.5m of M29S Box Truss (3m, 2m & 0.5m) (34.65kg- 6.3kg/m)
1x Sleeve Block (25.2kg)
1x Head Section (7.3kg)
1x Base (12.9kg)
1x Motor Attachment Bracket (4.93kg)
4x Short Outriggers (3.1kg each)
4x Modular Hinge Set (2.15kg each)
8x Female Couplers (0.280kg each)
12x Conical Coupler (EGG) (0.148kg each)
28x M Series Spigot (0.042kg each)
28x M Series R-Spring (0.003kg each)
Each tower- 111.27kg
Please note, no long outriggers or stabiliser bars were purchased.
Other Equipment Required
4x Chain Motors
1x Motor Control Cabinet
1x Motor Controller
1x 32amp Cable
4x Motor Power & Control Looms
A distro may also be required depending on the venue.
16x 12mm black packer- used to protect the floor surfaces
4x 3.25t Shackle- used to attach the chain hook to the sleeve block
4x 3.25t Shackle- used to attach the bottom of the chain motor to the motor attachment bracket
4x 2m Soft Steel- Used to safety the towers (results in a trim height of 5m)
4x 3.25t Shackle- Used to attach the soft steel to the outside of the sleeve block
4x 2t Shackle- Used to attach the soft steel to the sleeve block- a 2t shackle is used as the attachment point can only fit the pin of a 2t shackle and not a 3.25t shackle.
MPT Structure Assembly
1)Build tower spans (5m of truss & head section) and set aside
2)Build grid spans
3)Attach grid spans to sleeve blocks using hinges. Ensure pins are always facing into the truss and not sticking out!
4)Lift tower spans into place and to base section
5)Set up motors and run power/ control
6)Upright towers and pull chain up and over sheave
7)Level out bases and check grid is level
8)Raise grid
9)Check level
10)Safety attached- see picture below
How to attach a safety
Storage
To keep the base, sleeve block, and header section tidy they can all be connected together using the 0.5m section of truss and the hinge sets. The short outriggers can also be stored in middle.
Information Documents
Sixty82 Brochure Download https://www.sixty82.nl/downloads/
CPP3 Temporary Venue Project
The self climbing towers had their first outing on CPP3. As the BSL performance was taking place in the Chandler, CPP3 had to be moved to another venue. The decision was made to host the shows in RS2.
More info can be found on this project here- CPP3 Collaborations 2019