Cinderella 2019
.
Cinderella 2019 | |
---|---|
Summary | |
Dates Sat 7th Dec - Fri 13th Dec
| |
Performance Course Third Year BA Acting
| |
Location New Athenaeum Theatre
| |
Creative Team | |
Director Ali De Souza
| |
Designer Ken Harrison
| |
Sound Designer | |
Lighting Designer | |
Production Team | |
Stage Manager | |
Deputy Stage Manager | |
Assistant Stage Manager | |
Stage Supervisor | |
Head of Flys | |
Deputy Stage Supervisor | |
Deputy Stage Supervisor | |
Assitant Stage Supervisor | |
Assitant Stage Supervisor | |
Assitant Stage Supervisor | |
Production Electrician | |
Deputy Production Electrician | |
Deputy Production Electrician | |
Deputy Production Electrician | |
Lighting Technician | |
Lighting Technician | |
LX Programmer | |
Production Sound Engineer | |
Sound No.1 | |
Sound No.3 |
Stage Management
Stage Department
Ground Plan
Kinesys Lift
To access one of 4 balconies in this show we used a 4x4 piece of steel and our kinesys automation software to make a lift. This meant that we were maximizing the amount of space in the wings as when the platform was not in use we could fly it up out the way to allow set to pass below. To get the points in the grid where we wanted them we had to make up bridles to span between the beams and also remove grid panels. The bridles were made up using beam clamps, Shackles, Strops and clutch chains. Down on the piece of steel deck we attached handrails to 3 sides and had a gate made for the final so that when it was moving the people on it could not fall out and felt comfortable while they were in it. To reduce the swinging movement in the lift two guides were attached. The first guide was made using a 4000mm and 2000mm section of uni beam which was attached onto a scaff pole and out rigged on edge from the truss. Onto the track was a heavy duty scenery carrier which was bolted through the bolt hole on the steel deck. Down the other side of the deck was a tension line which ran from the grid straight to stage. An eye bolt and pulley were attached onto the steel deck platform using another bolt hole so that the pulley ran smoothly as the lift went up and down.
Truss Bridge
Fly plot
Set Images
Lighting
Sound
x