CPP2 Redline

From paperclip
Revision as of 00:15, 7 June 2013 by Pwatson (talk | contribs) (Created page with "Category:Productions Category:CPP Category:Chandler {| style=" border: 4px solid #F2CECE; background-color: #FFFFFF; float: right; clear: right; margin: 2px; wi...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search


CPP2 Redline
File:Rcs.jpg
CPP 1&4 Season
Creative
Director 4th years
Lighting Designer Mike Parkin
Stats
Venue Chandler
Performance Dates 29th May - 6th June

Part of the CPP festival happening over May/June in the Chandler, 3 Different shows over 2 weeks with CPP4 directing CPP1

Company

Creative Team

Director:

Lighting Designer:



Technical Production Team

Stage Manager:

Assistant Stage Management:


Chief Production Electrician:

Deputy Production Electrician:

Sound Designer/ Sound Number 1:

Sound Number 2:

Electricians:


Stage Management

Electrics

Stage Tech

For this show we were required to build a false grid into the venue under the catwalks to allow curtains to be dropped into place during the show.

Hardware used:

Curtains/Drifts (temp) Main Tab (Downstage Bar of Catwalk 3)

  • Tab 1200 MM (Chandler Black)
  • Tarfor tension drift system
  • 2 Beam clamps
  • 2 shackles

Divider (Stage Right side – Underneath Catwalk 3)

  • Tab (The longer white cyc 7500MM)
  • Scaff 6.5M
  • 4 strops (1M)
  • 5 0.25T shackles
  • 5 barrel clamps

Divider (Stage Left Side – Between Catwalk 2 & 1 rolling bar)

  • Tab (The shorter white cyc 40500MM)
  • Scaff 4.5M
  • 2 strops (1M)
  • 3 0.25T shackles
  • 3 barrel clamps

U/S – D/S Divider (All catwalks)

  • Tab (12m Tab)
  • Scaff 9.5M
  • 6 strops (1M)
  • 6 0.25T Shackles
  • 6 barrel clamps

Tabs On Permanent Track

  • Tab 12M U/S Wall (Ran on permeant triple e track)
  • Tab (2 half tabs kimbled together) SR Wing

Other Hardware

  • 6 pieces of 1M scaff clamped to scaff bars/lx bars to act as stability
  • 16 90 degree fixed scaff clamps