CPP2 Redline
CPP2 Redline | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
File:Rcs.jpg | ||||||||||||
CPP 1&4 Season
|
Part of the CPP festival happening over May/June in the Chandler, 3 Different shows over 2 weeks with CPP4 directing CPP1
Company
Creative Team
Director:
Lighting Designer:
Technical Production Team
Stage Manager:
Assistant Stage Management:
Chief Production Electrician:
Deputy Production Electrician:
Sound Designer/ Sound Number 1:
Sound Number 2:
Electricians:
Stage Management
Electrics
Stage Tech
For this show we were required to build a false grid into the venue under the catwalks to allow curtains to be dropped into place during the show.
Hardware used:
Curtains/Drifts (temp) Main Tab (Downstage Bar of Catwalk 3)
- Tab 1200 MM (Chandler Black)
- Tarfor tension drift system
- 2 Beam clamps
- 2 shackles
Divider (Stage Right side – Underneath Catwalk 3)
- Tab (The longer white cyc 7500MM)
- Scaff 6.5M
- 4 strops (1M)
- 5 0.25T shackles
- 5 barrel clamps
Divider (Stage Left Side – Between Catwalk 2 & 1 rolling bar)
- Tab (The shorter white cyc 40500MM)
- Scaff 4.5M
- 2 strops (1M)
- 3 0.25T shackles
- 3 barrel clamps
U/S – D/S Divider (All catwalks)
- Tab (12m Tab)
- Scaff 9.5M
- 6 strops (1M)
- 6 0.25T Shackles
- 6 barrel clamps
Tabs On Permanent Track
- Tab 12M U/S Wall (Ran on permeant triple e track)
- Tab (2 half tabs kimbled together) SR Wing
Other Hardware
- 6 pieces of 1M scaff clamped to scaff bars/lx bars to act as stability
- 16 90 degree fixed scaff clamps