Children of Eden
Children of Eden | |
---|---|
[[]] | |
Summary | |
Dates 20th May 2023 - 25th May 2023
| |
Performance Course Third Year MT
| |
Location New Athenaeum Theatre
| |
Creative Team | |
Director | |
Designer | |
Sound Designer/No.1 | |
Lighting Designer | |
Production Team | |
Stage Manager | |
Deputy Stage Manager | |
Assistant Stage Manager [[]]
| |
Assistant Stage Manager [[]]
| |
Head of Stage | |
Head of Flys | |
LX Programmer | |
PLX | |
Production Sound Engineer | |
Sound No. 2 | |
Associate Sound Designer |
Overview
Technical Stage Department
Lighting
Stage Management
Sound
I think the main challenge on this production for sound was the ensemble's use of the auditorium. Specifically for the number at the top of act 2, Generations. The whole ensemble began in the auditorium making their way to stage whilst singing.
This required lots of thought and programming on Digico. During quiet time I had to put a very specific GEQ on the vocal mics to ensure feedback was eliminated, I took the decision to have two dedicated vocal eq's. One for onstage and one for bridge/auditorium signing. This meant every time that a cast member crossed from the stage to the bridge that a new Digico snapshot was required on the desk which meant that there was at least 150 different snapshots in the show.
Children of Eden Band List :
Reed 1 – flute/pic
Reed 2 – Clarinet/tenor saxophone
Reed 3 – Oboe/Cor
French Horn
Cello
Keys 1
Keys 2
Keys 3
Drums
Percussion - vibraphone,timps,glock,bongos,marimba
Guitar 1
Guitar 2
Electric Bass
From the start there were conversations had about how this shouldn't sound like the original very 90's synth-y sound track, instead it should be a lot more bass-y and powerful. This meant I had to centre the mix around Keys 1, E.Bass, and drum kit.
We used the in house ath PA for Children of Eden but took the decision to add two d&b C7 subs, one in either slip. This was to add more low frequencies in the stalls which is a common complaint in the ath as the sub cluster is too far away and doesn't properly fill the room. We also added four front fills, d&b e0's, two on either side of the bridge.
In terms of monitoring, I had two d&b e3's sitting right behind the the closest front fills to the bridge, this ensured a healthy amount of monitoring downstage, where a lot of the action was taking place. I also decided to put two d&b max12's behind the first flats L&R for mid stage monitoring. Lastly I decided to hang two d&b e3's on ladders upstage, this was for more specific moments like the opening where the ensemble begin upstage for the first two verses. Also for moments like the flood where star was isolated from the ensemble and behind the mound set piece and as this was a particularly loud number I decided to give her more help monitoring wise.
File:Children of Eden Speaker Plan.pdf