Much Ado About Nothing 2011: Difference between revisions

From paperclip
Jump to navigation Jump to search
Fnisbet (talk | contribs)
No edit summary
Fnisbet (talk | contribs)
No edit summary
Line 16: Line 16:
|-
|-
|'''Assistant Director'''  
|'''Assistant Director'''  
|[[Andrew McGregor]]-
|[[Andrew McGregor]]
|-
|-
|'''Lighting Designer'''  
|'''Lighting Designer'''  
Line 25: Line 25:
|'''Venue'''
|'''Venue'''
|[[:Category:Chandler|Chandler]]
|[[:Category:Chandler|Chandler]]
|-
|'''Rehearsal Period'''
| 7 February - 17 March '11
|-
|-
|'''Tech Week'''
|'''Tech Week'''
| 28 February '11
| 2nd May '11
|-
|-
|'''Performance Dates'''
|'''Performance Dates'''
| 19, 21, 22, 24 and 25 March '11
| 10th - 14th May '11
|}
|}
|}
|}

Revision as of 17:55, 4 May 2011

Much Ado About Nothing 2011
[[Image:|225px]]
Much Ado About Nothing Poster
Creative
Written by
Director Ali de Souza
Assistant Director Andrew McGregor
Lighting Designer Alexander Ridgers
Stats
Venue Chandler
Tech Week 2nd May '11
Performance Dates 10th - 14th May '11

Cast

Director - Ali de Souza

Assistant Director - Andrew McGregor


David Bode

Chris Fulton

Max Greig

Jess Hardwick

Beatrice - Lucy Hollis

Don John - Ross Mann

Benedick - Martin McBride

Mark Rowley

Natalie Songer

Hero - Bobby Stewart

Margaret - Molly Vevers

Set

The set consists of mainly steeldeck, but also has a 2 red curtains on the back wall and two hard maskers either side of the stage.

The steeldeck is as pictured below, with the back row being at 500mm high and the rest being at 300mm high. The circle around the 300mm deck is a platform, also at 300mm, built in sections to fit around the steeldeck and make it rounded. The deck was then covered with painted sheets and routered to match the curve of the stage.

The large red curtain was cable tied onto the tab track upstage of the steeldeck, and then cut down the middle.

Technical Challenges

The main technical challenge that we came across was bolting the steeldeck together, as the sides of the extra curved pieces touched the ground and the 300mm deck was too short to fit underneath. Because of this the curves and deck were flipped upside down, bolted together and then flipped back over, in as few sections as possible, while still being manageable. The middle section was then bolted together, and the large pieces either side were cabled tied onto the row behind, and then the small front section slotted in.