Pit Bridge: Difference between revisions

From paperclip
Jump to navigation Jump to search
No edit summary
No edit summary
Line 9: Line 9:
    
    
Steel deck:   
Steel deck:   
1 x 8'x4'
1 x 8'x4'
1 x 4'x2'
1 x 4'x2'


Scaff:
Scaff:
Line 17: Line 17:
2 x 2000mm legs
2 x 2000mm legs
    
    
Treads:     2 x 2-step-treads  (used by the band to go down onto the pit lift)
Treads:
            1 x 4-step-treads  (used to go from the stage to the pit bridge, and vice versa.  These should be stored in the back pit)


Kee-Klamps:  2 x feet, like these: [[Image:kee_klamp_shelf_4_sm.jpg]]
2 x 2-step-treads  (used by the band to go down onto the pit lift)
1 x 4-step-treads  (used to go from the stage to the pit bridge, and vice versa. These should be stored in the back pit)


Misc. hardware : 6 x 2" backflap hinges
Kee-Klamps: 
                4 x 4" backflap hinges
 
                black tat to dress edges of steel deck
2 x feet, like these:  [[Image:kee_klamp_shelf_4_sm.jpg]]
                4mm ply to pack as needed
 
                2 x M10 bolts w/ Nylocks and washers
Misc. hardware :  
 
6 x 2" backflap hinges
4 x 4" backflap hinges
black tat to dress edges of steel deck
4mm ply to pack as needed
2 x M10 bolts w/ Nylocks and washers

Revision as of 20:05, 19 December 2009

This page was created after the 2009 RSAMD Panto "Sleeping Beauty", so that it may be used as a resource for future TSM/Production carpenters to use as a template, should the need arise for a pit bridge to made on any future productions.

Please feel free to edit this page should you see fit, and improve on the design of the pit bridge at your leisure. After all, it is a learning establishment!

NB: This design may change, depending on the level needed for the orchestra pit. Should this be the case, lengthen/shorten the scaff legs as necessary.


Parts needed:

Steel deck: 1 x 8'x4' 1 x 4'x2'

Scaff:

6 x 600mm legs 2 x 2000mm legs

Treads:

2 x 2-step-treads (used by the band to go down onto the pit lift) 1 x 4-step-treads (used to go from the stage to the pit bridge, and vice versa. These should be stored in the back pit)

Kee-Klamps:

2 x feet, like these:

Misc. hardware :

6 x 2" backflap hinges 4 x 4" backflap hinges black tat to dress edges of steel deck 4mm ply to pack as needed 2 x M10 bolts w/ Nylocks and washers