The Seagull: Difference between revisions

From paperclip
Jump to navigation Jump to search
No edit summary
No edit summary
Line 3: Line 3:
[[Category:Drama]]
[[Category:Drama]]


During the recent production of "The Seagull" there were several technical challenges that we had to overcome. As well as designing and constructing a 6 piece [[Kabuki Drops|Kabuki drop]], we also had to come up with a way of rigging quick release tension wire system. Initial attempts at constructing this included using a Turfer which as expected turned out to be far too loud to derig during a short scene change. After much deliberation, it was decided that the most effective method involved using an automation motor to create the desired effect.  
During the recent production of "The Seagull" there were several technical challenges that we had to overcome. As well as designing and constructing a 6 piece [[Kabuki Drops|Kabuki drop]], we also had to come up with a way of rigging quick release tension wire system. Initial attempts at constructing this included using a Tirfor which as expected turned out to be far too loud to de-rig during a short scene change. After much deliberation, it was decided that the most effective method involved using an automation motor to create the desired effect.  


Having moved a motor to the desired position, we then lowered the line to meet a 15metre wire drift and attached the two with wedge sockets and shackles. we also added a karabiner between the two lines in order to make the release time quicker and simpler. At a lower point in the line (the  same height as the top of the curtain a snatch block was used to divert the direction of the line. A ratchet strap was attached to the snatch block and anchored to a scaff bar at a 45 degree angle which would maintain the horizontal position of the line.  
Having moved a motor to the desired position, we then lowered the line to meet a 15metre wire drift and attached the two with wedge sockets and shackles. we also added a karabiner between the two lines in order to make the release time quicker and simpler. At a lower point in the line (the  same height as the top of the curtain a snatch block was used to divert the direction of the line. A ratchet strap was attached to the snatch block and anchored to a scaff bar at a 45 degree angle which would maintain the horizontal position of the line.  


[[Image:tension wire picture.png]]
[[Image:tension wire picture.png]]

Revision as of 18:39, 15 November 2009


During the recent production of "The Seagull" there were several technical challenges that we had to overcome. As well as designing and constructing a 6 piece Kabuki drop, we also had to come up with a way of rigging quick release tension wire system. Initial attempts at constructing this included using a Tirfor which as expected turned out to be far too loud to de-rig during a short scene change. After much deliberation, it was decided that the most effective method involved using an automation motor to create the desired effect.

Having moved a motor to the desired position, we then lowered the line to meet a 15metre wire drift and attached the two with wedge sockets and shackles. we also added a karabiner between the two lines in order to make the release time quicker and simpler. At a lower point in the line (the same height as the top of the curtain a snatch block was used to divert the direction of the line. A ratchet strap was attached to the snatch block and anchored to a scaff bar at a 45 degree angle which would maintain the horizontal position of the line.