King Lear: Difference between revisions
Cwilloughby (talk | contribs) No edit summary |
Cwilloughby (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
[[ | KING LEAR | ||
Fit Up List | |||
•Put RSAMD black Tri Lyte truss | |||
•Lower Steel Deck bolted together positioned in centre | |||
•Top Steel Deck on top and bolted on | |||
•Flats positioned, bolted together, screwed to steel deck, cable tied to IWB under gallery. | |||
•Cloths hung by black sash from gallery and IWBs | |||
•Cloths leveled off and tops kept at same height | |||
•LX focus carried out | |||
•Floor cloth laid [Double sided tape and black Dance floor PVC] | |||
•Lay out seating [Traverse] | |||
KING LEAR | |||
Required Hardware | |||
•M10 Coach Bolts [10X] | |||
•Cable Ties | |||
•Double Sided Dance floor tape | |||
•Black PVC Dance floor tape | |||
•Black Sash | |||
KING LEAR | |||
Strike List | |||
•All seats onto trolleys | |||
•Drop all cloths | |||
•Lift and roll floor cloth | |||
•Unscrew flats from steel deck, unclip from IWB, unbolt | |||
•unbolt steel deck remove to backstage | |||
•LX Strike | |||
KING LEAR | |||
Van List | |||
King Lear | |||
13x Soft Hanging Cloths | |||
1x Floor Cloth | |||
3x 1220x2440 Steel Deck [Faced] | |||
2x Hard Flats | |||
Romeo and Juliet | |||
4x Platform Pieces | |||
Selected scaffolding and clamps | |||
Midsummer Nights Dream | |||
5x Scaffolding Lengths [2X 1000mm, 3X 600mm] | |||
2x Kabuki Drops | |||
STOCK BOX | |||
2x Black Gaffa Roll | |||
2x White Gaffa Roll | |||
2x Black/Silver LX Roll | |||
14x Screw Eyes | |||
DeWALT 14.4v Screw Gun [2x Batteries and Charger] | |||
Cable Ties | |||
1x Double-sided tape Roll | |||
2x Stage Weights | |||
Black Sash | |||
2x Scaffolding Swivel Clamps | |||
30 meter Black Absail Rope | |||
15 meter Absail Rope | |||
2x 5 meter Steel Wire Truss Ladders | |||
4x Doughty Hanging Clamp | |||
4x Hard Hats | |||
2x Adjustable Stage Braces | |||
1x Spanset [1 ton] | |||
1x Blue Pulley Block | |||
Calum Willoughby’s Equipment | |||
Rope Access Equipment | |||
Bump Cap | |||
Hard Hat | |||
Steel Toe Capped Boots | |||
Tool Belt | |||
Tool Box | |||
Ground Plans |
Revision as of 13:20, 19 June 2009
KING LEAR Fit Up List •Put RSAMD black Tri Lyte truss •Lower Steel Deck bolted together positioned in centre •Top Steel Deck on top and bolted on •Flats positioned, bolted together, screwed to steel deck, cable tied to IWB under gallery. •Cloths hung by black sash from gallery and IWBs •Cloths leveled off and tops kept at same height •LX focus carried out •Floor cloth laid [Double sided tape and black Dance floor PVC] •Lay out seating [Traverse]
KING LEAR Required Hardware •M10 Coach Bolts [10X] •Cable Ties •Double Sided Dance floor tape •Black PVC Dance floor tape •Black Sash
KING LEAR Strike List •All seats onto trolleys •Drop all cloths •Lift and roll floor cloth •Unscrew flats from steel deck, unclip from IWB, unbolt •unbolt steel deck remove to backstage •LX Strike
KING LEAR Van List King Lear 13x Soft Hanging Cloths 1x Floor Cloth 3x 1220x2440 Steel Deck [Faced] 2x Hard Flats Romeo and Juliet 4x Platform Pieces Selected scaffolding and clamps Midsummer Nights Dream 5x Scaffolding Lengths [2X 1000mm, 3X 600mm] 2x Kabuki Drops STOCK BOX 2x Black Gaffa Roll 2x White Gaffa Roll 2x Black/Silver LX Roll 14x Screw Eyes DeWALT 14.4v Screw Gun [2x Batteries and Charger] Cable Ties 1x Double-sided tape Roll 2x Stage Weights Black Sash 2x Scaffolding Swivel Clamps 30 meter Black Absail Rope 15 meter Absail Rope 2x 5 meter Steel Wire Truss Ladders 4x Doughty Hanging Clamp 4x Hard Hats 2x Adjustable Stage Braces 1x Spanset [1 ton] 1x Blue Pulley Block Calum Willoughby’s Equipment Rope Access Equipment Bump Cap Hard Hat Steel Toe Capped Boots Tool Belt Tool Box Ground Plans