The Speculator: Difference between revisions

From paperclip
Jump to navigation Jump to search
Dwilson (talk | contribs)
No edit summary
Dwilson (talk | contribs)
Line 98: Line 98:


=== Equipment List ===
=== Equipment List ===
<pdf></pdf>
<pdf>The_Speculator_2020_Equipment_List_.pdf</pdf>


=== Fit Up/ Weekly Plans ===
=== Fit Up/ Weekly Plans ===

Revision as of 12:26, 26 November 2020


The Speculator
Summary
Dates
2nd & 3rd December
Performance Course
Third Year BA Acting
Location
New Atheneum Theatre
Creative Team
Director
Mark Thomson
Assistant Director
Designer
Movement Director
Sound Designer
Lighting Designer
Production Team
Stage Manager
Deputy Stage Manager
Assistant Stage Manager
Assistant Stage Manager (Book Cover)
Assistant Stage Manager
Technical Stage Supervisor
Head of Flys
Deputy Technical Stage Supervisor
Deputy Technical Stage Supervisor
Production Electrian
DPLX
Lighting Crew
PSE


Team

Overview

The Speculator is set in Paris in 1720. The French playwright Pierre Marivaux is playing games with love and chance. Europe is in chaos. And John Law, a Scot from Edinburgh, is the richest and most powerful man in the world. He upsets order and alters the value of money. How long can his influence last?


Cast

Stage Management

The ASMs did some provisional props lists, risk assessments and props research tasks remotely before most props were cut due to Coronavirus safety measures.

However the ASMs did build an IKEA bed and mix some brown and black paint with some Cuprinol Oak finish wood stain which was then painted onto the bed as well as using the mixed brown and black paint to paint the top of a table.

the Tavern Crates and Barrels were borrowed from NTS.

Technical Stage Department

Design

Renders

Ground Plans

⧼embed_pdf_invalid_relative_domain⧽

Masking Plan

Dimensions provided on the plan so that an accurate representation of the masking drawn in Vectorworks can be achieved in the venue. ⧼embed_pdf_invalid_relative_domain⧽

Tracking Backdrop Plans

⧼embed_pdf_invalid_relative_domain⧽

Equipment List

Fit Up/ Weekly Plans

⧼embed_pdf_invalid_relative_domain⧽

⧼embed_pdf_invalid_relative_domain⧽

Show Running

⧼embed_pdf_invalid_relative_domain⧽

Checks ⧼embed_pdf_invalid_relative_domain⧽

Flys

Flys & Hemp Plot

⧼embed_pdf_invalid_relative_domain⧽

Points Plans

Points Plans ⧼embed_pdf_invalid_relative_domain⧽

Points Master ⧼embed_pdf_invalid_relative_domain⧽

Grid Plans

⧼embed_pdf_invalid_relative_domain⧽

Load Calculations

⧼embed_pdf_invalid_relative_domain⧽

Checks

⧼embed_pdf_invalid_relative_domain⧽

Fly Cue Sheet

⧼embed_pdf_invalid_relative_domain⧽

Sound

Lighting