== Equipment == | |||
2 Rows of Steeldeck were added bedind the existing rostra | |||
1 row consisting of 4 of 8'x4' and 1 of 4'x4' | |||
back row consisting of 4 of 8'x2' and 1 of 4'x2' | |||
All deck on 600mm legs | |||
== Rigging == | |||
Upstage Motors were hung from the existing head height I-beams marked SWL200kg | |||
Upstage end of teh side trusses were hung from 5m of H30V Truss spanning the two end beams at catwalk height | |||
Downstage Motors were hung in a unequal bridle, using clutch chains and a doubled 5m drift around the large cylindrical beams at head height in the high catwalks |
Revision as of 16:52, 5 January 2015
Equipment
2 Rows of Steeldeck were added bedind the existing rostra
1 row consisting of 4 of 8'x4' and 1 of 4'x4' back row consisting of 4 of 8'x2' and 1 of 4'x2'
All deck on 600mm legs
Rigging
Upstage Motors were hung from the existing head height I-beams marked SWL200kg
Upstage end of teh side trusses were hung from 5m of H30V Truss spanning the two end beams at catwalk height
Downstage Motors were hung in a unequal bridle, using clutch chains and a doubled 5m drift around the large cylindrical beams at head height in the high catwalks