TSM Project 2008 - Deck Platform: Difference between revisions

From paperclip
Jump to navigation Jump to search
Mmcgowan (talk | contribs)
Mmcgowan (talk | contribs)
Line 14: Line 14:


3 x Lite Deck
3 x Lite Deck
8 x Round Slings
8 x Round Slings
8 x 1T D Shackles
8 x 1T D Shackles
4 x 10m Single Leg Wire Rope Bridles (7mm/ Thimbles on both ends)
4 x 10m Single Leg Wire Rope Bridles (7mm/ Thimbles on both ends)
48 x M10 Bolts
48 x M10 Nuts

Revision as of 15:57, 11 March 2008

Concept

The concept for my project is simple, I would like to have an Up Stage platform which raises and lowers throughout the perfomance.

Ideas

For my project, I looked at using electric winches in order to raise and lower a platform (Made from 3 Lite Deck). I understand that when briefed on the project we were told we had an unlimited budget, however after costing for these winches I decided to use the counterweight flying system, as I believe that this more like the reality of beaing a Technical Stage Manager.

In order to increase my safety factor, I obtained the hardware for the project as if I were making the platform from Steel Deck. In reality I would use Lite Deck.


Required Hardware

3 x Lite Deck

8 x Round Slings

8 x 1T D Shackles

4 x 10m Single Leg Wire Rope Bridles (7mm/ Thimbles on both ends)

48 x M10 Bolts

48 x M10 Nuts