CPP2 Redline: Difference between revisions

From paperclip
Jump to navigation Jump to search
Pwatson (talk | contribs)
Created page with "Category:Productions Category:CPP Category:Chandler {| style=" border: 4px solid #F2CECE; background-color: #FFFFFF; float: right; clear: right; margin: 2px; wi..."
 
Pwatson (talk | contribs)
Blanked the page
 
Line 1: Line 1:
[[Category:Productions]]


[[Category:CPP]]
[[Category:Chandler]]
{| style=" border: 4px solid #F2CECE; background-color: #FFFFFF; float: right; clear: right; margin: 2px; width: 22em;"
! style="background-color: #009900; font-size: 120%;" align="center" colspan="2"| <span style="color: #FFFFFF;">'''{{PAGENAME}}'''</span>
|-
| align="center" | [[Image:rcs.jpg]]
|-
| align="center" | ''CPP 1&4 Season''
{| style="background: none; width: 22em; margin: 0 auto;"
|-
! style="background-color: #009900; font-size: 120%;" align="center" colspan="2"| <span style="color: #FFFFFF;">'''Creative'''</span>
|-
|'''Director'''
|[[4th years]]
|-
|'''Lighting Designer'''
|[[Mike Parkin]]
|-
! style="background-color:#009900; font-size: 120%;" align="center" colspan="2"| <span style="color: #FFFFFF;">'''Stats'''</span>
|-
|'''Venue'''
|[[:Category:Chandler|Chandler]]
|-
|'''Performance Dates'''
|29th May - 6th June
|}
|}
Part of the CPP festival happening over May/June in the Chandler, 3 Different shows over 2 weeks with CPP4 directing CPP1
==Company==
===Creative Team===
Director:
Lighting Designer:
===Technical Production Team===
Stage Manager:
Assistant Stage Management:
Chief Production Electrician:
Deputy Production Electrician:
Sound Designer/ Sound Number 1:
Sound Number 2:
Electricians:
==Stage Management==
==Electrics==
==Stage Tech==
For this show we were required to build a false grid into the venue under the catwalks to allow curtains to be dropped into place during the show.
'''Hardware used:
'''
''Curtains/Drifts (temp)
''
Main Tab (Downstage Bar of Catwalk 3)
*Tab 1200 MM (Chandler Black)
*Tarfor tension drift system
*2 Beam clamps
*2 shackles
Divider (Stage Right side – Underneath Catwalk 3)
*Tab (The longer white cyc 7500MM)
*Scaff 6.5M
*4 strops (1M)
*5 0.25T shackles
*5 barrel clamps
Divider (Stage Left Side – Between Catwalk 2 & 1 rolling bar)
*Tab (The shorter white cyc 40500MM)
*Scaff 4.5M
* 2 strops (1M)
* 3 0.25T shackles
* 3 barrel clamps
U/S – D/S Divider (All catwalks)
*Tab (12m Tab)
*Scaff 9.5M
*6 strops (1M)
*6 0.25T Shackles
*6 barrel clamps
''Tabs On Permanent Track
''
*Tab 12M U/S Wall (Ran on permeant triple e track)
*Tab (2 half tabs kimbled together) SR Wing
''Other Hardware
''
*6 pieces of 1M scaff clamped to scaff bars/lx bars to act as stability
*16 90 degree fixed scaff clamps

Latest revision as of 00:16, 7 June 2013