One of the main design elements was a large painted floorcloth. Due to the nature of the AGOS as a concert venue, we were unable to fix into the floor. This created a logistical challenge with the floorcloth. | One of the main design elements was a large painted floorcloth. Due to the nature of the AGOS as a concert venue, we were unable to fix into the floor. This created a logistical challenge with the floorcloth. | ||
We decided to weight the edges of the floorcloth down using a number of fly weights from the Ath. | |||
We decided to weight the edges of the floorcloth down using a number of fly weights from the Ath. These were placed in a wooden channel that workshop manufactured, along the side and back edges of the cloth. This resulted in needing approximately 120 fly weights. | |||
Despite | |||
These fly weights needed to be removed, and returned to the loading gallery before and after the production period. |
Revision as of 21:02, 5 June 2013
MACCT Shakespeares 2013 - Women Beware Women & All's Well That Ends Well | ||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
'
|
MACCT Shakespeare double bill. Performed in rep.
Electrics
LX Overview
The Rig was comprised entirely of Generic Fixtures, all powered and controlled by the existing dimmer infrastructure in the RCS AGOS. Control was provided in the form of a ETC Congo, running a single Que stack for both shows, one after the other. Four onstage booms provided sidelight while specials were also placed around the set. Archway Back light was provided by 4 upright booms behind the set.
LX Equipment
Fixtures
- STRAND Cantata Profile 11/26 - 6
- STRAND Cantata Profile 18/32 - 18
- STRAND Cantata Fresnel - 28
- SELECON Acclaim Fresnel - 16
- STRAND Coda Flood - 2
- PAR 64 (CP62) - 14
- PAR 16 - 8
Control
- ETC Congo
- Strand LD90's
LX Documents
⧼embed_pdf_invalid_relative_domain⧽
⧼embed_pdf_invalid_relative_domain⧽
Technical Challenges
Floor Cloth
One of the main design elements was a large painted floorcloth. Due to the nature of the AGOS as a concert venue, we were unable to fix into the floor. This created a logistical challenge with the floorcloth.
We decided to weight the edges of the floorcloth down using a number of fly weights from the Ath. These were placed in a wooden channel that workshop manufactured, along the side and back edges of the cloth. This resulted in needing approximately 120 fly weights.
Despite
These fly weights needed to be removed, and returned to the loading gallery before and after the production period.