Steel Deck: Difference between revisions
Jump to navigation
Jump to search
Krobertson (talk | contribs) No edit summary |
Krobertson (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
Here is a list of the RSAMD's steel deck stock, correct as of 22 July 2010 | Here is a list of the RSAMD's steel deck stock, correct as of 22 July 2010 | ||
*2440 x 1220 (8'x4') = '''20''' (6 are currently "permanently" installed in SLS as a workshop mezzanine level)So this makes ''' | *2440 x 1220 (8'x4') = '''20''' (6 are currently "permanently" installed in SLS as a workshop mezzanine level)So this makes '''14''' availiable | ||
*1220 x 1220 (4'x4') = '''6''' | *1220 x 1220 (4'x4') = '''6''' | ||
*2440 x 610 (8'x2') = '''6''' | *2440 x 610 (8'x2') = '''6''' |
Revision as of 10:42, 11 April 2012
Here is a list of the RSAMD's steel deck stock, correct as of 22 July 2010
- 2440 x 1220 (8'x4') = 20 (6 are currently "permanently" installed in SLS as a workshop mezzanine level)So this makes 14 availiable
- 1220 x 1220 (4'x4') = 6
- 2440 x 610 (8'x2') = 6
- 1220 x 610 (4'x2') = 2
- 915 x 610 (3'x2') = 1
Should a box need to be made for the US corner of the pit (ie where the pit lift meets the front of the stage), the angle at the inside corner is approximately 81 degrees. TVD '11
Below is a link to Steeldeck's approved methods of assembly, as well as information about bracing on steeldeck at height