Inner Space 2012: Difference between revisions

From paperclip
Jump to navigation Jump to search
Jhowes (talk | contribs)
No edit summary
Jhowes (talk | contribs)
mNo edit summary
Line 39: Line 39:
|[[Ashley Kerray]], [[Natalie Wilson]]
|[[Ashley Kerray]], [[Natalie Wilson]]
|-
|-
! style="background-color:#5BA0D7; font-size: 120%;" align="center" colspan="2"| <span style="color: #CC0000;">'''Stats'''</span>
! style="background-color:#000000; font-size: 120%;" align="center" colspan="2"| <span style="color: #CC0000;">'''Stats'''</span>
|-
|-
|'''Venue'''
|'''Venue'''

Revision as of 19:58, 21 January 2012


Inner Space 2012
[[Image:|225px]]
Publicity Poster
Production Team
Project Management Oran O'Neill
Stage Management / Publicity & Front of House Jane Paterson, Rosie Barber, Elleanor Taylor
TSM Andrew McCabe, Christopher McIntyre, Jennifer Howes
Lighting Design Sam Cunningham
Lighting Daphne Mir, Kathryn Douglas, Ben Terry
AV Patrick Watson
Sound Graeme Brown
Set Ashley Kerray, Natalie Wilson
Stats
Venue New Athenaeum Theatre
Performance Date Thursday 19th January 2012, 7.00pm

TSM

Lowered grid

The grid was constructed from 2 single purchase bars and 3 double purchase bars; 11, 14, 15, 16 and 21. These were cross-braced with a number of lengths of scaff bar, attached with right-angle and swivel clamps (19 in total). We would have liked to have used entirely right-angled clamps, apart from the 4 used to connect the 2 lengths which were not at right angles to the counterweight bars. However, we were unable to find enough.

We also initially planned to connect another 6m bar to the far SR end. However, we felt that the grid was rigid enough without, and that the clamps could be better used elsewhere.

Bar weights were worked out as follows:

Bar 5 (LX): 7.68kg + 10% = 8.5kg. Therefore, 1 weight - but another 1/2 was added to make it easier to fly. 1 1/2 weights

Bar 8 was added to help provide support to the grid. No weights were used.

Bar 11 (Grid): 68.11kg + 10% = 75kg. 6 1/2 weights. However, when the bar was weighted, another 4 weights were added. 10 1/2 weights.

Bar 14 (Grid. Double purchase): 106.35 + 10% = 117kg. 19 1/2 weights. Only 19 weights were ever put into the cradle.

Bar 15 (Grid. Double purchase): 69.96 + 10% = 77kg. 12 1/2 weights. Only 12 weights were ever put into the cradle.

Bar 16 (Grid. Double purchase. Identical to 14): 117kg. 19 1/2 weights -> 19 weights.

Bar 21 (Grid. Identical to 11): 75kg. 6 1/2 weights -> 10 1/2 weights.

Bar 24 was added to help provide support to the grid. No weights were used.

Bar 27 (LX. Identical to 5): 8.5kg. 1 weight. Another 1/2 was added to make it easier to fly. 1 1/2 weights

Masking

Full blacks were hung on bars 2 and 29. We used them to mask the unsightly iron and the back wall of the stage. We initially wanted them on 1 and 30. However, 2 is the first available bar, and there was a cyc currently being stored on bar 30. We also had to be careful of bar 28 when flying 29 in and out, due to a row of floods being stored on the bar. Initially we planned to have the cyc fully out and the full black on 29, in. However, we discovered that this drew the audience's eyes towards the ceiling and the grid, especially when the stage lighting was on. Therefore we solved this problem by bringing the cyc fully in to hide it almost entirely behind the full black.

Hemp lines

3 hemp lines were put in SR using single 1T pulleys and 3 short slings. These were placed at 2m intervals along the scaffolding bar above the gap in the grid. A 6m bar was attached, to enable the set 'cubes' to be flown. These provided a decorative feature to the stage.

On the SL side, 4 double 1T pulleys were put in at distances of 1.5m. 2 lines were dropped from each pulley. 1 for the border, and another for the 3x7m legs. The border was 13x4m, attached to a 6m bar. This meant that the majority of the fabric was folded back on itself, creating folds in the bottom of the fabric. This meant that the bottom of the border had a tendency to fall in a curve. This was solved by attaching gripons to pull the border tighter.

The 3x7m legs were attached to a 6m bar with 2 x 700mm bar extensions. These were used to mask the AV screen.

We originally put in a sharkstooth gauze from 3 points, hung directly off the prompt side fly floor. This was going to be used as a screen to back project onto. However, as a result of too much light shining through from the scene dock, this was changed for a screen requiring only 2 points, connected via 2 very small slings.

Both the screen, border and legs were breasted back to ensure that they lay flat against the fly floor for maximum floor space.

A hard masking flat was placed lengthways underneath the screen to complete the 'black box' effect.7

2 other 3x7m legs were used to provide stage masking. They were hung from points at distances x and x. These were hung from 2 x 2m bars. The excess material was on-stage, to provide a neat edge. We had to be careful about the positioning of these points, as they sat very close to some of the lanterns on the grid.

AV

Initial Design Note

The initial design for the AV was to have a projector set up at the rear of the stage and project a mixture of camera shots/visual effects. Chris McIntyre then came up with the idea to also stream photographs from pictures taken at the event.

Equipment Used

The majority of kit was sourced through the AV Department the BNC camera cables were source through Venues.

  • Projector - (With a BNC input)
  • Projector Mount (In case rear projection failed)
  • Panasonic AV MX50 Desk (With TV monitor)
  • 3 Cameras (With adapters to link to BNC cable)
  • 3 Tripods
  • DVD player (with composite output)
  • 12X9ft Rear Projection Screen