Here is a list of the RSAMD's steel deck stock, correct as of 22 July 2010 | Here is a list of the RSAMD's steel deck stock, correct as of 22 July 2010 | ||
*2440 x 1220 (8'x4') = '''20''' ( | *2440 x 1220 (8'x4') = '''20''' (6 are currently "permanently" installed in SLS as a workshop mezzanine level)So this makes 16 availiable | ||
*1220 x 1220 (4'x4') = '''6''' | *1220 x 1220 (4'x4') = '''6''' | ||
*2440 x 610 (8'x2') = '''6''' | *2440 x 610 (8'x2') = '''6''' |
Revision as of 19:50, 22 February 2012
Here is a list of the RSAMD's steel deck stock, correct as of 22 July 2010
- 2440 x 1220 (8'x4') = 20 (6 are currently "permanently" installed in SLS as a workshop mezzanine level)So this makes 16 availiable
- 1220 x 1220 (4'x4') = 6
- 2440 x 610 (8'x2') = 6
- 1220 x 610 (4'x2') = 2
- 915 x 610 (3'x2') = 1
Should a box need to be made for the US corner of the pit (ie where the pit lift meets the front of the stage), the angle at the inside corner is approximately 81 degrees. TVD '11
Below is a link to Steeldeck's approved methods of assembly, as well as information about bracing on steeldeck at height