Here is a list of the RSAMD's steel deck stock, correct as of 22 July 2010 | Here is a list of the RSAMD's steel deck stock, correct as of 22 July 2010 | ||
*2440 x 1220 (8'x4') = 20 | *2440 x 1220 (8'x4') = 20 (4 are currently "permanently" installed in SLS as a workshop mezzanine level) | ||
*1220 x 1220 (4'x4') = 6 | *1220 x 1220 (4'x4') = 6 | ||
*2440 x 610 (8'x2') = 6 | *2440 x 610 (8'x2') = 6 |
Revision as of 12:19, 12 May 2011
Here is a list of the RSAMD's steel deck stock, correct as of 22 July 2010
- 2440 x 1220 (8'x4') = 20 (4 are currently "permanently" installed in SLS as a workshop mezzanine level)
- 1220 x 1220 (4'x4') = 6
- 2440 x 610 (8'x2') = 6
- 1220 x 610 (4'x2') = 2
- 915 x 610 (3'x2') = 1
Should a box need to be made for the US corner of the pit (ie where the pit lift meets the front of the stage), the angle at the inside corner is approximately 81 degrees. TVD '11
Below is a link to Steeldeck's approved methods of assembly, as well as information about bracing on steeldeck at height