Sarah Crooks: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 3: | Line 3: | ||
I am in first year at the RSAMD doing Technical Production Arts in the applied artist strand. | I am in first year at the RSAMD doing Technical Production Arts in the applied artist strand. | ||
I have 3weeks in each | I have 3weeks in each department; construction, props, costume and started with scenic art. I worked on [[Sleeping Beauty Panto 09]] in the Scenic Workshop and absolutely loved it!! I hope to work in film or TV doing an applied artists role, hopefully scenic art. |
Latest revision as of 20:40, 13 January 2010
Sarah Crooks
I am in first year at the RSAMD doing Technical Production Arts in the applied artist strand.
I have 3weeks in each department; construction, props, costume and started with scenic art. I worked on Sleeping Beauty Panto 09 in the Scenic Workshop and absolutely loved it!! I hope to work in film or TV doing an applied artists role, hopefully scenic art.