Pit Bridge: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 6: | Line 6: | ||
Parts needed: | |||
Steel deck: 1 x 8'x4' | |||
1 x 4'x2' | 1 x 4'x2' | ||
Scaff: 6 x 600mm legs | |||
2 x 2000mm legs | 2 x 2000mm legs | ||
Treads: 2 x 2-step-treads (used by the band to go down onto the pit lift) | |||
1 x 4-step-treads (used to go from the stage to the pit bridge, and vice versa. These should be stored in the back pit) | 1 x 4-step-treads (used to go from the stage to the pit bridge, and vice versa. These should be stored in the back pit) | ||
Kee-Klamps: 2 x feet, like these: [[Image:kee_klamp_shelf_4_sm.jpg]] |
Revision as of 19:59, 19 December 2009
This page was created after the 2009 RSAMD Panto "Sleeping Beauty", so that it may be used as a resource for future TSM/Production carpenters to use as a template, should the need arise for a pit bridge to made on any future productions.
Please feel free to edit this page should you see fit, and improve on the design of the pit bridge at your leisure. After all, it is a learning establishment!
NB: This design may change, depending on the level needed for the orchestra pit. Should this be the case, lengthen/shorten the scaff legs as necessary.
Parts needed:
Steel deck: 1 x 8'x4'
1 x 4'x2'
Scaff: 6 x 600mm legs
2 x 2000mm legs
Treads: 2 x 2-step-treads (used by the band to go down onto the pit lift)
1 x 4-step-treads (used to go from the stage to the pit bridge, and vice versa. These should be stored in the back pit)