Automated Trucks 2022: Difference between revisions

From paperclip
Jump to navigation Jump to search
Sscott3 (talk | contribs)
No edit summary
Sscott3 (talk | contribs)
No edit summary
Line 26: Line 26:
|-
|-
|<span style="color: White;">'''Specialism'''</span>  
|<span style="color: White;">'''Specialism'''</span>  
|<span style="color: Black;">TSM</span>
|<span style="color: Black;">Stage Technology</span>
|-
|-



Revision as of 16:23, 7 October 2022



The attempt use Kineysys Motors to move 'Merrily We Roll Along' Set pieces across the stage..


Automated Trucks
File:ScottyTobyRory.jpeg
Info
Students Scotty & Toby Cass
Course Production Technology & Management
Graduating Year 2023 (RCS Graduate 23)
Specialism Stage Technology


General Info

The director requested that all props and set movements are to be done by cast. No crew are to be seen on stage at any point. This left lots to be figured out as the downstage truck is only 600mm high and needs to travel US and DS. The plan is for the truck to be made out of 4 bits of steel deck, double layered, this roughly puts it at 0.5 Tonne.