'''Act 1''' | |||
1. La Sylphide | |||
2. Vigier | |||
3. Keep your coins we want change | |||
4. Loosemore | |||
5. Maufris | |||
'''ACT 2''' | |||
6. Murmur | |||
7. Signature | |||
8. Jazz | |||
9. Shoesmith | |||
===Technical Stage Department=== | ===Technical Stage Department=== | ||
'''The stage''' | |||
The ballet department had requested a black box venue like in previous years. To keep the look clean but versatile I decided t use eight hard maskers, four in each wing, the most up stage on each wing backing onto a BP screen on bar 24 (used as a cyc) and the remaining six being paired with soft masking dog legs to provide wing masking while the hard maskers provided a clean onstage look. | |||
The ath dance floor was laid as usual and the metal kick rail was installed on the pit edge. Although there was no band the ballet department requested that the pit lift was down to reduce unused stage space as they would not choreograph any dancing on it. Lx used this as an opportunity to place uplighting on the pit lift, this was done by building staff pipe structures and screwing them to the pit lift using kee clamp bases. | |||
The Ath front of house tabs were used along with two black gauzes and one full tab. |
Revision as of 13:58, 11 June 2022
Performance Order
Act 1 1. La Sylphide 2. Vigier 3. Keep your coins we want change 4. Loosemore 5. Maufris
ACT 2 6. Murmur 7. Signature 8. Jazz 9. Shoesmith
Technical Stage Department
The stage
The ballet department had requested a black box venue like in previous years. To keep the look clean but versatile I decided t use eight hard maskers, four in each wing, the most up stage on each wing backing onto a BP screen on bar 24 (used as a cyc) and the remaining six being paired with soft masking dog legs to provide wing masking while the hard maskers provided a clean onstage look. The ath dance floor was laid as usual and the metal kick rail was installed on the pit edge. Although there was no band the ballet department requested that the pit lift was down to reduce unused stage space as they would not choreograph any dancing on it. Lx used this as an opportunity to place uplighting on the pit lift, this was done by building staff pipe structures and screwing them to the pit lift using kee clamp bases. The Ath front of house tabs were used along with two black gauzes and one full tab.
Ballet Showcase 2022 | |
---|---|
Summary | |
Dates 9th - 11th June 2022
| |
Location New Athenaeum Theatre
| |
Production Team | |
Production Manager Lynfryn Mckenzie
| |
Stage Manager | |
Deputy Stage Manager | |
Stage Supervisor | |
Stage Technicians | |
Lighting Designer | |
Lighting Programmer & Operator | |
Production Electrician |