Into The New 2021: Difference between revisions
Jump to navigation
Jump to search
Line 82: | Line 82: | ||
===Design=== | ===Design=== | ||
The overall design requirements for Into the New | The overall design requirements for Into the New was a black box space with the option to have different backgrounds and floor colours. | ||
See file below for individual production requirements. | See file below for individual production requirements. |
Revision as of 09:20, 28 March 2021
Overview
Shows/ Cast
Stage Management
Technical Stage Department
Design
The overall design requirements for Into the New was a black box space with the option to have different backgrounds and floor colours.
See file below for individual production requirements.
Media:ITN_TSD_Production_Info.pdf
Ground Plans
Masking Plan
Equipment List
Fit Up/ Strike Plan
Fit Up Plan
Strike Plan
Show Running
Turnaround Document
Flys
Flys & Hemp Plot
⧼embed_pdf_invalid_relative_domain⧽
Points Plans
Points Plans ⧼embed_pdf_invalid_relative_domain⧽
Points Master ⧼embed_pdf_invalid_relative_domain⧽