Into The New 2021: Difference between revisions
Jump to navigation
Jump to search
Line 92: | Line 92: | ||
=== Equipment List === | === Equipment List === | ||
<pdf> | <pdf>ITN_Equipment_List.pdf</pdf> | ||
=== Fit Up/ Strike Plan === | === Fit Up/ Strike Plan === |
Revision as of 16:05, 18 March 2021
Overview
Shows/ Cast
Stage Management
Technical Stage Department
Design
The overall design requirements for Into the New were a black box space with the option to have different backgrounds and floor colours. Some shows had their own requirements.
Ground Plans
⧼embed_pdf_invalid_relative_domain⧽
Masking Plan
⧼embed_pdf_invalid_relative_domain⧽
Equipment List
The URL or file path ITN_Equipment_List.pdf does not exist.
Fit Up/ Strike Plan
Fit Up Plan
Strike Plan
Show Running
Team Running Document ⧼embed_pdf_invalid_relative_domain⧽
Flys
Flys & Hemp Plot
⧼embed_pdf_invalid_relative_domain⧽
Points Plans
Points Plans ⧼embed_pdf_invalid_relative_domain⧽
Points Master ⧼embed_pdf_invalid_relative_domain⧽