Middletown: Difference between revisions
Line 185: | Line 185: | ||
[[File:UnderBridge.jpg|300px|Bridge]] [[File:Getoff.jpg|300px|Get off]] | [[File:UnderBridge.jpg|300px|Bridge]] [[File:Getoff.jpg|300px|Get off]] | ||
[[File:Getoff1.jpg|300px|left|Get off]] [[File:Clamp.jpg|300px|Bridge Deck]] | [[File:Getoff1.jpg|300px|left|Get off]] [[File:Clamp.jpg|300px|Bridge Deck]] | ||
[[File:Truss.jpg|300px | [[File:Truss.jpg|300px|Truss Support]] [[File:Build.jpg|300px|Buttress tower]] | ||
[[File:Flyplot2.png|600px|left|Fly Plot]] | [[File:Flyplot2.png|600px|left|Fly Plot]] |
Revision as of 12:42, 14 February 2020
Summary
A play about a town, the world, & life
Cast
John Dodge - Sam Stopford and Angus Taylor
Mary Swanson - Alana Jackson and McCallister Selva
Male Doctor/Ground Control - Jamie Burch
Cop - Keiran Duncan
Librarian - Eimear Fearon
Female Doctor/Tour Guide - Lesley Lemon
Mechanic - Calvin Noble
Public Speaker/Male tourist/Greg/Janitor - Jack McCreadie
Female tourist/Landscaper/Attendant - Margaux Mustos
Lighting
Sound
Mic Placement
2 DPA microphones were used to mic up different of furniture such as tables. This was interesting as these table sat behind perplex glass, which caused some issues when EQing as it was reflective behind the glass, however this created a nice effect once reverb was applied. The audience were able to hear small sounds such as clicking of a pen or movement of a tea-cup across the table.
2 DPA microphones were also put into the underneath of the truss bridge. This allowed us to amplify conversation from behind the glass as well as more intimate sounds such as foot steps.
We hid a small speaker underneath the sink, which was used a couple time during the show for sink gargling noises.
This is an image of our ground control headset that was lined with a DPA. We were able to effect the raw vocal with a mixture of 2 different Distortions, vocoder, reverb to create a crackly ground control voice.
Technical Stage Department
The biggest element of the show for the technical stage department was the 2.8M high truss bridge. The bridge was constructed using 95% of the RCS truss stock.
The top section of the bridge was constructed at ground level, raised using 4 load guard chain motors, the leg sections were then connected and the bridge was landed. Workshop attached the top deck before the bridge was put on legs to make the construction process easier and safer by keeping all work at ground level. They constructed the deck by using some 18mm ply and some timber bracing that spanned the width of the truss. This was attached to the truss using doughty half couplers. Once the bridge was clad it was covered in astro turf. The get offs were constructed using the buttress towers and a combination of treads, these were ratchet strapped to the truss bridge.
One problem that we encountered was that due to the length of the bridge and the fact there was no support in the middle it caused the bridge to bounce when walked on. To prevent this workshop constructed some supports that were screwed into the floor and attached to the truss using doughty half couplers.
Truss used.
3m x 8.
2m x 6.
1m x 5.
0.5m x 4.
0.25m x4 (hired from blacklight).
Base plate x 4.
Box (3 way corner) x 4.
Box (t piece) x 2.
Truss supports (built by workshop) x 4.