Julius Caesar 2018: Difference between revisions

From paperclip
Jump to navigation Jump to search
Dcampbell (talk | contribs)
Dcampbell (talk | contribs)
Line 100: Line 100:


The Ground Plan  
The Ground Plan  
[[File:Julius Caesar revised pic.jpg|900px]]
[[File:Julius Caesar revised pic.jpg|800px]]


The centre of the seating bank was made up by 3x  8x4  steel deck bolted together, it held 43 seats.  
The centre of the seating bank was made up by 3x  8x4  steel deck bolted together, it held 43 seats.  

Revision as of 13:36, 5 February 2018


Julius Caesar
Production Julius Caesar
Performance Time
Performance Dates Wednesday 24th January 2018 - Saturday 27th January 2018
Stats
Venue Chandler
Creative Team
Director Emily Reutlinger
Fight Director Raymond Short
Designer Kirsty Currie
Lighting Designer Calum Dunbar
Sound Designer Allan Hamilton


Production Team
Production Manager Ros Maddison
Stage Manager Rachel Matthews
Deputy Stage Manager Rosie Orford
Production Electrician Jak Coventry
Deputy Production Electrician Craig Stevenson
Technical Stage Manager Daryl Campbell
Assistant Stage Managers James McQueen
Jessica Reid
Madeline Hanton
Jessica McKay
Sound Op Ross Brodie
Lighting Programmer Adlai Faigen

Overview

Stage Management

Technical Stage Management

The Ground Plan

The centre of the seating bank was made up by 3x 8x4 steel deck bolted together, it held 43 seats. The stage right seating bank was made of 2x 8x4 bits of deck bolted together, it held 20 seats. The stage left seating bank was made of 2x 8x4 bits of deck bolted together, it held 20 seats.

Kabuki

The Kabuki was one of elements of the show. It was formed of a borrowed cloth from Dundee rep by the designer i attached 3 lengths of sash to the cloth as flying points. It was made by 4 bits of 3000mm 4 hinges and held up by 4 half doughty couplers and pins to hold the cloth up. The kabuki release was by pin hinge tied to sash to release it. The kabuki drop fired 17 times and reset 17 times The kabuki drop miss fired 1 time The wrong kabuki was drooped 2 times

Dias

The dias was made up of 4 8x4 bits of steel deck 1 4x4 bit of steel deck to make a dias in the centre of the stage this then had mdf floor with tiles glued to the top which then was screwed to the steel deck. There was a plan drawn by scenic that we followed to lay the floor. There was also rubble made from off cuts of mdf floor and polystyrene to look like rubble this was then measured from the deck enough to fit LED tape and secured to the floor by screws.

Confetti Drop

The confetti drop was made by 2 bits of 3500mm and held up by a half doughty coupler and a black tat cut at the bottom for the confetti to drop, for the drop to work it was attached to 2 scaff bars and have 2 eye hooks on the side of the wood. lines were ran from both eye hooks along the cat walks with pulleys guiding the lines to be tied off on the catwalk. for the confetti to drop you pull the 2 lines and the confetti will drop. 2kg of confetti were dropped throughout the run The confetti bag was refilled 16 times

Lighting

Sound

Photos