Line 48: |
Line 48: |
|
| |
|
|
| |
|
| == Original Choreography ==
| |
|
| |
| There were two dance breaks within the Opera, below is a notation of the original choreography.
| |
|
| |
| [[File:Half Hanniken Choreography.pdf]]
| |
|
| |
| [[File:Dance of the Fairies.pdf]]
| |
|
| |
|
|
| |
|
Line 60: |
Line 53: |
|
| |
|
|
| |
|
| == Model Box Pictures ==
| |
|
| |
| Please find the link below for the model box pictures of Sir John in Love.
| |
|
| |
| [[:File:Model Photos.pdf]]
| |
|
| |
| == Final Fly Plot ==
| |
|
| |
| Please find the link below for the final version of the fly plot for Sir John in Love.
| |
|
| |
|
| |
|
| |
| Masking Notes
| |
|
| |
| * Soft Masking =
| |
| * Hard Masking =
| |
|
| |
| == False Pros Rigging ==
| |
|
| |
| The false proscenium arch that is one of the main features within the duration of the opera is positioned between counter weight bars four and five.
| |
|
| |
| The position of the false pros became an issue when trying to implement it on stage due to the fact it had to be between two counter weight bars.
| |
|
| |
| Automation is not an option for this part of the stage as the building's structural "I" beams come to a node point between the grid panels causing the area to be too small for the automation spreader beam to fit in that area between bars 4 and 5.
| |
|
| |
| A hemp bar would also not be possible due to the weight of the structure.
| |
|
| |
| We finally decided on using the chain motors and a truss spreader to rig the false pros. Below is a detailed description of how we achieved this;
| |
|
| |
| *4 x loadgaurds
| |
| *4 x 3m h30v prolyte truss
| |
| *4 x 1.5m steel drift
| |
| *12 x 3 1/4 shackles
| |
| *4 x 2m strops
| |
| *5 x 1m drift
| |
| *4 x 8m drift
| |
|
| |
| We used a 1.5m steal drift with the plastic sleeve and wrapped it around the node point and connected it with itself with a 3 1/4t shackle. we then hung another 3 1/4t shackle of this to attach the chain for the motor to. the motor was then attached to the truss with a 3 1/4t shackle on a 2m strop that was wrapped around the truss. ( this was repeated for all motors)
| |
|
| |
| The false pros was then attached in two sections the header was attached with 1m drifts then raised until the bottom of the header was just off the floor. Then the legs of the pros were attached with pin hinges an 8m drifts then raised slowly into position.
| |
|
| |
| == Hydraulic Wheels for Trucks ==
| |
|
| |
| Each of the 2 trucks has Pneumatics installed to make is safer and easier to move and brake.
| |
|
| |
| They had 4 sets of tricasters, which were connected through narrow, durable air hose to a gas cylinder attached to the back of the trucks.
| |
|
| |
| They had a small switch which, when flicked, would change the truck from the down to up position (and visa versa).
| |
|
| |
|
| |
| There were some limitations though. We had to ensure that there was no extra weight in the trucks while they were raised, as the wheels could not take the weight.
| |
| Also, they were occasionally unreliable and did require a little bit of gentle persuasion.
| |
|
| |
| In whole however, they proved to be an excellent way to brake the trucks.
| |
|
| |
| == Notes ==
| |
|
| |
|
| |
|
| |
| == Assistant Lighting Designer ==
| |
|
| |
|
| |
| [[File:Sir John right and labeled section drawingAth 2014.pdf]]
| |
|
| |
|
| [[File:Sir John Plan FINAL 1-50.pdf]]
| |
|
| |
|
| ==Electrics== | | ==Electrics== |
Line 130: |
Line 59: |
| Control for this show was provided by the GrandMA1 Full-size console. The console was also running a network session, which allowed the designer to have a laptop with separate views and change these as she wished. | | Control for this show was provided by the GrandMA1 Full-size console. The console was also running a network session, which allowed the designer to have a laptop with separate views and change these as she wished. |
|
| |
|
| | ===Followspots=== |
|
| |
|
| ===Moveable Booms===
| | Followspots were used on this show. However the RJ Korrigans would have been too large to fit into the 1st Circle Slip Positions. Hence, 26 Degree source 4 units were used instead. |
| Because of the large trucks in the first half of the performance moveable booms were required on Stage Left. Unfortunately there were no boom bases with wheels so we used a dolly to transport the boom into and out of the scene dock as required. There was also cross plugging required - this just meant we needed clear and obvious labeling on all of the plugs. We also needed to do an interval focus, where we set up cues in the desk to focus the instruments individually.
| |
| ===Paging Ladders===
| |
| The height of the trucks were an issue with the ladders. The USL Ladder was unable to be rigged onto automation so we had a piece of sash to page the ladder out of the way when moving the trucks on or off stage.
| |
Creative Team
Director Olly Platt
Conductor Timothy Dean
Assistant Director Noa Nomatt
Designer Cordelia Chisholm
Assistant Designer Basia Binkowska
Lighting Designer Alex Kilgour
Production Team
Production Manager Stephen Roe
Stage Manager Astrid Rothmeier
Deputy Stage Manager Kiri Newberry
Assistant Stage Managers Yesha Subtonic West, Laurie Sutton, Amy Dawson, Susannah McWhirter
Technical Stage Manager Daniel Thompson
Deputy Technical Stage Manager Fiona Dalgleish
Head Flyman Ben Leach
Stage Technicians Louise Charity, Andrew Jackson, Ruth Green, Stephen Keenan,
Chief Production Electrician Neil Smith
Deputy Production Electrician" Gary Ashbridge
"Board Programmer and Operator Calum Farquhar
Assistant Electricians Heather McKennan, Jack McWeeny
Stage Management
Technical Stage Management
Electrics
Control
Control for this show was provided by the GrandMA1 Full-size console. The console was also running a network session, which allowed the designer to have a laptop with separate views and change these as she wished.
Followspots
Followspots were used on this show. However the RJ Korrigans would have been too large to fit into the 1st Circle Slip Positions. Hence, 26 Degree source 4 units were used instead.