==Technical Stage Management== | |||
===Kit List=== | |||
====Clamps==== | |||
90° Scaff Clamp 31 | |||
Swivel Scaff Clamp 75 | |||
Split Swivel Scaff Clamps 15 (30 halves) | |||
Split Doughty Clamps 1 (2 halves) | |||
I-Beam Doughty Clamps 6 | |||
Wall Hinges 12 | |||
====Feet==== | |||
Square Feet 24 | |||
Round Feet 10 | |||
Split Round Feet 2 | |||
====Masking==== | |||
Chandler Soft Blacks (4m x 6m) 3 | |||
Hard Black Book Flat (6m) 2 | |||
Hard Black Book Flat (5.5m) 2 | |||
French Braces 4 |
Revision as of 11:08, 12 January 2015
Show Dates
Preview 29th November 2014
2nd of December - 5th of December 2014
Creative Team
- Director - Joe Douglas
- Designer - Suzie Inglis
- Choreographer - Chris Wilson
- Musical Director - David Highman
- Assistant Musical Director - Tamara Saringer
- LX Designer - Davy Cunningham
- Sound Designer - Laura Dougan
Production Team
- Production Manager - Stephen Roe
- Stage Manager - Katy Nicolson
- Deputy Stage Manager - Siobhán Scott
- Technical Stage Manager - Ian Smyth
- Deputy Technical Stage Manager - Daniel Thompson
- Assistant Stage Managers - Bradley Jones, Rory Boyd
- Chief Production Electrician - Mary Crook
- LX Programmer - Robbie Butler
- Electricians - Ross Pringle, Neil Smith
- Sound 1 - Fraser Milroy
- Sound 2 - Sean Quinn
- Wardrobe Supervisor - Cate Mackie
- Wardrobe Deputy - Meg Davies
- Wardrobe Assistant - Barbara Grant
- Venue Technician - Gary Laing
Stage Management
To help us put the scaffolding back up in the Chandler I made a note of the markings on the scaffolding bars and the position of the steel deck legs.
File:Scaffolding Tower Markings.docx
Lots of drinks were used in the show. Below is a document outlining how the drinks were made.
File:Drinks Mixing ourhouse.pdf
Attached below is a risk assessment for a cast performing on a scaffolding platform structure in rehearsals.
File:OH Cast on Platform in Rehearsals RA.pdf
Technical Stage Management
Kit List
Clamps
90° Scaff Clamp 31 Swivel Scaff Clamp 75 Split Swivel Scaff Clamps 15 (30 halves) Split Doughty Clamps 1 (2 halves) I-Beam Doughty Clamps 6 Wall Hinges 12
Feet
Square Feet 24 Round Feet 10 Split Round Feet 2
Masking
Chandler Soft Blacks (4m x 6m) 3 Hard Black Book Flat (6m) 2 Hard Black Book Flat (5.5m) 2 French Braces 4