== Rigging == | == Rigging == | ||
The main Truss was S52V and hired from Black Light | |||
Upstage Motors (H1-H4) were hung from the existing head height I-beams marked SWL200kg | Upstage Motors (H1-H4) were hung from the existing head height I-beams marked SWL200kg | ||
Upstage end of the side trusses (H5, H6) were hung from 5m of H30V Truss spanning the two | Upstage end of the side trusses (H5, H6) were hung from 5m of H30V Truss spanning the two beams SL & SR beams at catwalk height and ratcheted in place. | ||
Downstage Motors (H7, H8) were hung using a unequal bridle, using clutch chains and a doubled 5m drift around the large cylindrical beams at head height in the high catwalks | Downstage Motors (H7, H8) were hung using a unequal bridle, using clutch chains and a doubled 5m drift around the large cylindrical beams at head height in the high catwalks | ||
8m X 8m Half Tabs were hung on the back chord of the side trusses | |||
12m X 7m Old Full Black was hung on the back chord of the back truss |
Revision as of 17:01, 5 January 2015
Equipment
2 Rows of Steeldeck were added bedind the existing rostra
1 row consisting of 4 of 8'x4' and 1 of 4'x4' back row consisting of 4 of 8'x2' and 1 of 4'x2'
All deck on 600mm legs
Rigging
The main Truss was S52V and hired from Black Light
Upstage Motors (H1-H4) were hung from the existing head height I-beams marked SWL200kg
Upstage end of the side trusses (H5, H6) were hung from 5m of H30V Truss spanning the two beams SL & SR beams at catwalk height and ratcheted in place.
Downstage Motors (H7, H8) were hung using a unequal bridle, using clutch chains and a doubled 5m drift around the large cylindrical beams at head height in the high catwalks
8m X 8m Half Tabs were hung on the back chord of the side trusses
12m X 7m Old Full Black was hung on the back chord of the back truss