Swingin' Into Christmas 2014: Difference between revisions
Jump to navigation
Jump to search
SMacluskie (talk | contribs) No edit summary |
SMacluskie (talk | contribs) |
||
Line 26: | Line 26: | ||
== Rigging == | == Rigging == | ||
Upstage Motors were hung from the existing head height I-beams marked SWL200kg | Upstage Motors (H1-H4) were hung from the existing head height I-beams marked SWL200kg | ||
Upstage end of | Upstage end of the side trusses (H5, H6) were hung from 5m of H30V Truss spanning the two end beams at catwalk height | ||
Downstage Motors were hung | Downstage Motors (H7, H8) were hung using a unequal bridle, using clutch chains and a doubled 5m drift around the large cylindrical beams at head height in the high catwalks |
Revision as of 16:53, 5 January 2015
Equipment
2 Rows of Steeldeck were added bedind the existing rostra
1 row consisting of 4 of 8'x4' and 1 of 4'x4' back row consisting of 4 of 8'x2' and 1 of 4'x2'
All deck on 600mm legs
Rigging
Upstage Motors (H1-H4) were hung from the existing head height I-beams marked SWL200kg
Upstage end of the side trusses (H5, H6) were hung from 5m of H30V Truss spanning the two end beams at catwalk height
Downstage Motors (H7, H8) were hung using a unequal bridle, using clutch chains and a doubled 5m drift around the large cylindrical beams at head height in the high catwalks