Gloria: Difference between revisions
No edit summary |
SMacluskie (talk | contribs) |
||
(19 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
[[Category:Productions]] | [[Category:Productions]] | ||
[[Category: | [[Category:Drama]] | ||
[[Category:Chandler]] | [[Category:Chandler]] | ||
Line 22: | Line 22: | ||
|'''Designer''' <div style="text-align: centre;"> [[Morven McLeod]] </div> | |'''Designer''' <div style="text-align: centre;"> [[Morven McLeod]] </div> | ||
|- | |- | ||
|'''Sound Designer''' <div style="text-align: centre;"> [[Fraser Mackie]] </div> | |'''Sound Designer & Percussionist''' <div style="text-align: centre;"> [[Fraser Mackie]] </div> | ||
|- | |- | ||
|'''Lighting Designer''' <div style="text-align: centre;"> [[Aisha Oyedepo]] </div> | |'''Lighting Designer''' <div style="text-align: centre;"> [[Aisha Oyedepo]] </div> | ||
Line 41: | Line 41: | ||
|- | |- | ||
|'''Production Sound Engineer''' <div style="text-align: centre;"> [[Nathan Farndale]] </div> | |'''Production Sound Engineer''' <div style="text-align: centre;"> [[Nathan Farndale]] </div> | ||
|- | |||
|'''Sound Crew/Sound Operators''' <div style="text-align: centre;"> [[Lana Kirk]] [[Iz Brett]] </div> | |||
|} | |} | ||
Line 51: | Line 53: | ||
==Stage Management== | ==Stage Management== | ||
==TSD== | ==TSD== | ||
From a TSD perspective Gloria wasn't a big show, it involved 3 Flying lighting practical's. 2 office lights and a pendant light in the centre of the stage for the cafe scene (act 2 scene 1). the office lights would be in for Act 1 and Act 2 scene 2 which were 2 scenes set within 2 separate offices. | |||
the Office lights were lights we already had in stock in the LX store, these already had right angled plates attached to the top of them with slots cut into them. This made them very easy to rig. We used a 3/4T shackle with a paracord line, bow-lined to the shackle, up to the pulley then off to the middle catwalk to a cleat that was made out of a half doughty clamp, 2 small half cleats facing away from each other to make a cleat. with the small hole in the middle of one of the cleats was perfect to put a stopper knot in the line for the in dead's. this allowed a smooth run when it had to live run in. | |||
Because the office lights are positioned stage left to stage right this meant I needed 2 cross bars per light and with a stock of only 19 bars all departments had to work around each other to ensure we didn't over run our amount of bars. | |||
listed bellow is a list of the rigging per flying light. | |||
== Ground plans == | |||
Ground plan for Act 1 Set | |||
<pdf>gloria-Act1.pdf</pdf> | |||
Ground plan for Act 2 Scene 1 Set | |||
<pdf>Gloria-Act2 S1 update V1.pdf</pdf> | |||
Ground plan for Act 2 Scene 2 Set | |||
<pdf>Gloria-Act2 S2.pdf</pdf> | |||
== TSD technical aspects == | |||
'''OFFICE LIGHTS:''' | |||
4 - 3/4T shackles ( 2 per light ) | |||
4 - 6m black paracord lines ( cut from stock material ) | |||
4 - 0.5m strops ( double choked to get as high up as they could do ) | |||
4 - 1T shackles ( to attach the pulley to the strop ) | |||
4 - swing cheek petzl Pulleys | |||
2 - custom made cleats | |||
'''CLEATS:''' | |||
1 - small piece of timber ( cut from stock ) | |||
1 - 30mm M10 bolt | |||
1 - half doughty coupler | |||
1 - M10 T-nut | |||
2 - small cleats | |||
''All found in Cage on left hand side (minus timber)'' | |||
'''Cafe pendant light''' | |||
1 - 6m paracord line | |||
1 - 0.5m strop ( double choked ) | |||
1 - 1T shackle | |||
1 - swing cheek Petzl pulley | |||
1 custom made cleat | |||
'''Seating banks''' | |||
the 2 seating banks were made up of 4 bits of 8x4 steel deck, these were raised on 200mm legs. this allowed our back row in the audience a better line of sight to watch the play. We put a kick rail along the back sides of the steel deck and 4ft (1220mm) long hand rails on either end of the steel deck to prevent anyone falling off with their chair. | |||
'''permanent seating bank cloth ''' | |||
To hide the permanent seating bank in the chandler We used a 6100mm scaffolding pole joined with a 400mm scaffolding pole, rigged onto this was 3 standard barrel clamps. These barrel clamps were then attached to a 0.5m strop via a 1T shackle, which was then attached to another 1T shackle which was also attached to another 0.5m strop, however this last strop was double choked around the bar. | |||
to attach this we put 3 hemp lines into the made up scaffolding bar and hauled the bar with the cloth attached up to the cross bars and held it there whilst someone attached the rigging to the pre - rigged, double choked strops. this allowed the cloth to sit comfortably and was a perfect distance for the cloth to just be touching the floor. | |||
'''A list of the rigging is bellow | |||
permanent seating bank masking:''' | |||
1 - 13m x 4m border ( Stock number 116 ) | |||
1 - 6100mm scaffolding pole | |||
1 - 4000mm scaffolding pole | |||
1 - key clamp ( alan key size 8 ) | |||
3 - barrel clamps | |||
9 - 1T shackles | |||
6 - 0.5m 1T strops | |||
3 - chandler hemp lines | |||
==Lighting== | ==Lighting== | ||
Line 60: | Line 120: | ||
==Sound== | ==Sound== | ||
'''Sound Kit''' | |||
'''Speaker Plan''' | |||
<pdf>Gloria_Speaker_Plan.pdf</pdf> |
Latest revision as of 14:57, 13 June 2022
Gloria | |
---|---|
[[ ]] | |
Summary | |
Dates 12th May 2022 - 14th May 2022
| |
Performance Course Third Year BA Acting
| |
Location Chandler Studio Theatre
| |
Creative Team | |
Director | |
Designer | |
Sound Designer & Percussionist | |
Lighting Designer | |
Production Team | |
Stage Manager | |
Deputy Stage Manager | |
Assistant Stage Manager | |
Head of Stage | |
LX Programmer | |
PLX | |
Production Sound Engineer | |
Sound Crew/Sound Operators |
Overview
Stage Management
TSD
From a TSD perspective Gloria wasn't a big show, it involved 3 Flying lighting practical's. 2 office lights and a pendant light in the centre of the stage for the cafe scene (act 2 scene 1). the office lights would be in for Act 1 and Act 2 scene 2 which were 2 scenes set within 2 separate offices. the Office lights were lights we already had in stock in the LX store, these already had right angled plates attached to the top of them with slots cut into them. This made them very easy to rig. We used a 3/4T shackle with a paracord line, bow-lined to the shackle, up to the pulley then off to the middle catwalk to a cleat that was made out of a half doughty clamp, 2 small half cleats facing away from each other to make a cleat. with the small hole in the middle of one of the cleats was perfect to put a stopper knot in the line for the in dead's. this allowed a smooth run when it had to live run in.
Because the office lights are positioned stage left to stage right this meant I needed 2 cross bars per light and with a stock of only 19 bars all departments had to work around each other to ensure we didn't over run our amount of bars. listed bellow is a list of the rigging per flying light.
Ground plans
Ground plan for Act 1 Set
Ground plan for Act 2 Scene 1 Set
Ground plan for Act 2 Scene 2 Set
TSD technical aspects
OFFICE LIGHTS: 4 - 3/4T shackles ( 2 per light ) 4 - 6m black paracord lines ( cut from stock material ) 4 - 0.5m strops ( double choked to get as high up as they could do ) 4 - 1T shackles ( to attach the pulley to the strop ) 4 - swing cheek petzl Pulleys 2 - custom made cleats
CLEATS: 1 - small piece of timber ( cut from stock ) 1 - 30mm M10 bolt 1 - half doughty coupler 1 - M10 T-nut 2 - small cleats All found in Cage on left hand side (minus timber)
Cafe pendant light 1 - 6m paracord line 1 - 0.5m strop ( double choked ) 1 - 1T shackle 1 - swing cheek Petzl pulley 1 custom made cleat
Seating banks the 2 seating banks were made up of 4 bits of 8x4 steel deck, these were raised on 200mm legs. this allowed our back row in the audience a better line of sight to watch the play. We put a kick rail along the back sides of the steel deck and 4ft (1220mm) long hand rails on either end of the steel deck to prevent anyone falling off with their chair.
permanent seating bank cloth To hide the permanent seating bank in the chandler We used a 6100mm scaffolding pole joined with a 400mm scaffolding pole, rigged onto this was 3 standard barrel clamps. These barrel clamps were then attached to a 0.5m strop via a 1T shackle, which was then attached to another 1T shackle which was also attached to another 0.5m strop, however this last strop was double choked around the bar. to attach this we put 3 hemp lines into the made up scaffolding bar and hauled the bar with the cloth attached up to the cross bars and held it there whilst someone attached the rigging to the pre - rigged, double choked strops. this allowed the cloth to sit comfortably and was a perfect distance for the cloth to just be touching the floor. A list of the rigging is bellow
permanent seating bank masking: 1 - 13m x 4m border ( Stock number 116 ) 1 - 6100mm scaffolding pole 1 - 4000mm scaffolding pole 1 - key clamp ( alan key size 8 ) 3 - barrel clamps 9 - 1T shackles 6 - 0.5m 1T strops 3 - chandler hemp lines
Lighting
Sound
Sound Kit
Speaker Plan